Title Page

  • Site

  • Started on

  • Inspected by

  • Subcontractor

  • Foreman

  • Works Certified

  • Completed on

PRE WORK CHECKS

  • CORRECT SANWARE AS PER SCHEDULES

  • SITE CLEAN

PLUMBING BATH INSTALATION

  • BATH POSITION CORRECT

  • BATH SQUARE & LEVEL

  • WATE, TRAP & OVERFLOW INSTALLED CORRECTLY & TESTED

PLUMBING FINAL FIX

  • ADEQUATE FIXINGS USED FOR VANITIES

  • VANITIES PLUMB AND LEVEL

  • ADEQUATE FIXINGS FOR BASINS TOILETS AND ZINK

  • WASTES, TRAPS AND PAN CONECTORS LEAK FREE

  • ANGLE VALVES AND FLEXI CONNECTORS LEAK FREE

  • SOLAR PANNEL/HEATPUMP INSTALATION CORRECT

  • SHOWER ARMS AND ROSES SECURE

  • ADEQUATE FIXINGS FOR MIXERS AND TAPS

  • MIXER AND TAP COVERS SECURED WITH SILICONE

  • ADEQUATE SEAL WORK ON ALL BASINS AND BATHS

  • ALL PLUMBING PRESSURE TESTED

  • SEWER INSPECTED AND FLUSHED

  • RODDING EYES INSTALLED TO NGL

  • COC ISSUED

GENERAL

  • HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!

  • REQUIRED PPE

  • SAFETY FILE UP TO DATE

APPROVALS

  • PLUMBING INSPECTOR SIGNATURE

  • SUBCONTRACTOR SIGNATURE

  • FOREMAN SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.