Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works certified
-
Completed on
PRE WORK CHECKS
-
SCREED COMPLETE
-
PAINT 1ST COAT COMPLETE
-
DETERMINE DIFFERENT TILES FOR EACH AREA
-
DETERMINE TILE STRIP TRIMMING
-
DETERMINE SPACER SIZE
-
DETERMINE GROUT CULOURS
-
SET OUT FLOOR LINES
-
SET OUT WALL LINES AND HEIGHTS
-
SITE CLEAN
TILE WORK
-
NO HOLLOW TILES
-
TILE CORNERS FLUSH
-
WALL AND FLOOR TILES LEVEL
-
SHOWER FLOOR CORRECT
-
SPACERS REMOVED BEFORE GROUTING
-
GROUTING FINISH
-
CORNERS EN EDGES FINISHED ACCORDING TO SPEC
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE