Title Page
-
Site
-
Efr Number
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
PRE INSTALATION CHECKS
-
CONCRETE BEAMS COMPLETE
-
BRICKWORK 2ND PHASE COMPLETE
-
APPROVED SLAB DESIGN DRAWINGS ON SITE
-
SITE CLEAN
INSTALATION
-
ADIQUATE SLIP JOINT AS PER SPEC
-
INSTALLED AS PER DRAWINGS
-
CANTILEVER SECTIONS CORRECT
-
CEILING LEVELS SATISFACTORY
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE