Title Page

  • Site

  • Started on

  • Inspected by

  • Subcontractor

  • Foreman

  • Works Certified

  • Completed on

PRE WORK CHECKS

  • TILE WORK COMPLETE

  • DOOR SCHEDULE COMPLETE AND ON SITE

  • DETERMINE CORRECT DOORS FOR EACH FRAME

  • DETRMINE LOCK HEIGHT

  • DETERMINE HINGE SIDE FOR EACH FRAME

  • SITE CLEAN

DOOR INSTALATION

  • DOOR CUT TO CORRECT SIZE, ADEQUATE SPACING ALL AROUND FOR PAINT AND GROUND CLEARANCE

  • HINGES , LOCKS AND STRIKER PLATES FLUSH AND NEAT

  • FIXINGS FOR HINGES , LOCKS AND STRIKER PLATES FLUSH AND NEAT

  • STRIKER BACK BOX INSTALLED

  • CORRECT FIXINGS FOR HANDLES AND EUCUTCHEONS

  • DOOR PLUMB AND LEVEL

GENERAL

  • HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!

  • REQUIRED PPE

  • SAFETY FILE UP TO DATE

APPROVALS

  • SUBCONTRACTOR SIGNATURE

  • FOREMAN SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.