Title Page

  • Site

  • Started on

  • Inspected by

  • Subcontractor

  • Foreman

  • Works Certified

  • Completed on

PRE WORK CHECKS

  • ROOF COVERINGS COMPLETE

  • ROOF SCREEDS COMPLETE

  • DETERMINE CORRECT WATERPROOFING MATERIAL AS PER SPEC

  • DETERMAN AREA, LEVELS AND LINES TO BE WATERPROOFED

  • SITE CLEAN

WATERPROOFING

  • SURFACE PREPARED

  • MOISTURE CONTENT CORRECT

  • CORECT LEVELS LINES AND AREAS WATERPROOFED AS PER SPEC

GENERAL

  • HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!

  • REQUIRED PPE

  • SAFETY FILE UP TO DATE

APPROVALS

  • SUBCONTRACTOR SIGNATURE

  • FOREMAN SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.