Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
Administrative Procedures
-
Subcontractor insurance is in compliance
-
Site safety plan completed and on file for AP and Subcontractors
-
Proper badges identification for subcontractor personnel
-
All personnel have attended job specific safety orientation
-
Pre task planning has been completed
-
First aid kit stocked and readily available
-
Subcontractor tool box talks signed and turned into AP
-
Proper signage posted on the job site (osha 300A, nearest medical location, construction personnel only etc.)
PPE
-
Appropriate PPE is in use. (Hard Hats, Safety Glasses, Vests and Gloves 100%)
Fire Safety
-
Egress route (2 means of access) posted in construction area and clearly visible
-
Adequate FE's located 1 per 3000 sq/ft within 75' of travel
-
FE's annual inspection tags are in place and current
-
Hot work permits are issued and posted in the area
Fall Protection / Working at Heights
-
100% tie off at 6' above working surface or higher
-
Fall protection equipment inspected (harnesses, lanyard, anchor points etc.)
-
Impalement hazards identified, removed and/or capped
-
Guardrails / Handrails installed at correct locations, correct heights and in good condition
-
Leading edge barricades / identification are in place 15' where applicable
-
Control Zones identified and properly maintained at areas of loading / off loading
Ladder / Stair Safety
-
LOTO for damaged / incorrect ladders and removed from site
-
Ladder used correctly (3' above landing,secured properly, standing on top rung etc.)
-
Aluminum ladders on site
-
Handrails at stairs, adequate lighting, pans filled, etc.
-
Damaged or modified stairs (ratings and safety stickers)
Scaffold Safety
-
Competent person for scaffold erection
-
LOTO in place for daily scaffold inspections
-
Scaffolds properly planked, guard rails, toe boards, access and all components compatible
-
Damaged / modified scaffolding
-
Proper use of scaffolds (weight capacities, locked wheels, correct access, no riding)
Building Systems
-
Critical / live systems clearly identified
-
System shutdowns coordinated and any associated permitting in place
-
Monitoring company notified and building placed on test in area of work
Dust Control / Housekeeping
-
Appearance and function of temporary construction barriers
-
Dust containment measures are being practiced (sticky mats, negative air machines, filter media etc.)
-
Protection of any delicate systems in construction area (smoke detectors, sprinkler heads, equipment etc.)
-
Construction area cleaned and cleared free of tripping hazards
-
Bulk material properly stored / protected and clear of egress
Equipment and Tools
-
Safety devices for tools are in place and being utilized (guards, safety switches etc.)
-
Correct tools for tasks are being used
-
Damaged or modified tools
-
Powder actuated tools - signage posted, training, live rounds etc.
Electrical
-
GFCI present and in use
-
Cords inspected and in proper condition (grounds, frayed, damaged, gauge etc.)
-
Extension cords are not a trip hazard
-
LOTO procedures present at hot panels and equipment
-
Exposure to overhead / underground power lines
Hazardous Materials
-
SDS readily available
-
Materials labeled properly
-
Materials stored properly
-
Proper handling of materials (gloves, masks etc.)
-
Emergency spill containment available
-
Lead or asbestos discovered on site
Additional Findings and Concerns
-
Add signature