Administrative Procedures

  • Subcontractor insurance is in compliance

  • Site safety plan completed and on file for AP and Subcontractors

  • Proper badges identification for subcontractor personnel

  • All personnel have attended job specific safety orientation

  • Pre task planning has been completed

  • First aid kit stocked and readily available

  • Subcontractor tool box talks signed and turned into AP

  • Proper signage posted on the job site (osha 300A, nearest medical location, construction personnel only etc.)

PPE

  • Appropriate PPE is in use. (Hard Hats, Safety Glasses, Vests and Gloves 100%)

Fire Safety

  • Egress route (2 means of access) posted in construction area and clearly visible

  • Adequate FE's located 1 per 3000 sq/ft within 75' of travel

  • FE's annual inspection tags are in place and current

  • Hot work permits are issued and posted in the area

Fall Protection / Working at Heights

  • 100% tie off at 6' above working surface or higher

  • Fall protection equipment inspected (harnesses, lanyard, anchor points etc.)

  • Impalement hazards identified, removed and/or capped

  • Guardrails / Handrails installed at correct locations, correct heights and in good condition

  • Leading edge barricades / identification are in place 15' where applicable

  • Control Zones identified and properly maintained at areas of loading / off loading

Ladder / Stair Safety

  • LOTO for damaged / incorrect ladders and removed from site

  • Ladder used correctly (3' above landing,secured properly, standing on top rung etc.)

  • Aluminum ladders on site

  • Handrails at stairs, adequate lighting, pans filled, etc.

  • Damaged or modified stairs (ratings and safety stickers)

Scaffold Safety

  • Competent person for scaffold erection

  • LOTO in place for daily scaffold inspections

  • Scaffolds properly planked, guard rails, toe boards, access and all components compatible

  • Damaged / modified scaffolding

  • Proper use of scaffolds (weight capacities, locked wheels, correct access, no riding)

Building Systems

  • Critical / live systems clearly identified

  • System shutdowns coordinated and any associated permitting in place

  • Monitoring company notified and building placed on test in area of work

Dust Control / Housekeeping

  • Appearance and function of temporary construction barriers

  • Dust containment measures are being practiced (sticky mats, negative air machines, filter media etc.)

  • Protection of any delicate systems in construction area (smoke detectors, sprinkler heads, equipment etc.)

  • Construction area cleaned and cleared free of tripping hazards

  • Bulk material properly stored / protected and clear of egress

Equipment and Tools

  • Safety devices for tools are in place and being utilized (guards, safety switches etc.)

  • Correct tools for tasks are being used

  • Damaged or modified tools

  • Powder actuated tools - signage posted, training, live rounds etc.

Electrical

  • GFCI present and in use

  • Cords inspected and in proper condition (grounds, frayed, damaged, gauge etc.)

  • Extension cords are not a trip hazard

  • LOTO procedures present at hot panels and equipment

  • Exposure to overhead / underground power lines

Hazardous Materials

  • SDS readily available

  • Materials labeled properly

  • Materials stored properly

  • Proper handling of materials (gloves, masks etc.)

  • Emergency spill containment available

  • Lead or asbestos discovered on site

Additional Findings and Concerns

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.