Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Safety cables at openings and leading edge

  • Reinforcement steel size and spacing

  • Reinforcement steel properly chaired

  • Decking and studs inspected by Terracon

  • MEP rough in complete

  • Required block outs are installed

  • Formed area is clean and clear of debris

  • Area is safe to pour

  • Photos

  • AP Representative

  • Sub Contractor Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.