Title Page
-
Conducted On:
-
Post Inspection Conducted By:
-
Operative Who Carried Out The Initial Work:
-
Document No.
Address, Client,
-
Client / Contract:
- HMS
- Hyndburn Homes
- Salix Homes
- Stockport Homes
- Riverside
- West Lancs Brough Council
- Wythenshawe Comunity Housing Group
- Vivark
-
Address of the installation:
-
Date initial works complete:
Visual Inspections
-
Location Of Consumer Unit:
-
Does the primary supply conductor information match the certificate?
-
Does the main earthing conductor information match the certificate?
-
Does the earthing system type match the certificate?
-
Are the main protective bonding conductors in place?
-
Are all accessories in an acceptable safe condition?
-
Is there a circuit schedule present at the consumer unit?
-
Are all suitable warning labels present?
-
Is the consumer unit's enclosure satisfactory in terms of IP rating?
-
Does the circuit layout match the certificate's circuit schedule?
-
Are all circuit breakers of a suitable type and rating?
-
Are all terminations/connections within the consumer unit tight and secure?
Testing and Inspections:
-
Is the measured Ze of an acceptable reading for the type of earthing system?
-
Is the PFC of an acceptable measurement for overcurrent protective device(s) rating(s)?
-
Are the RCD(s) operational and do trip times conform?
-
Are ring main conductors end to end measurements of an acceptable reading?
-
Do ring main end to end measurements match that off the certificate?
-
Do R1 + R2 continuity measurements match that off the certificate?
-
Do all (sampled) Zs measurements conform to maximum permissible?
Observations & recommendations:
-
Is the operatives summary on the condition report true and accurate?
Photographs:
-
Is there a photograph of the supply characteristics and earthing arrangements attached to the certificate?
-
Is there a photograph of the circuit schedule label attached to the certificate?
-
Is there a photograph of the Solar PV equipment attached to the certificate?
Tenant:
-
Is the tenant happy with the works completed?
-
Was the tenant made aware of the works completed by the electrician?
Post Inspection Information:
-
Summary
-
Post inspection completed by: