Title Page
-
Conducted on
-
Prepared by
-
Company
-
Select date
-
Project name & Country
-
Property Address
-
Customer Name
-
Scope of Works
-
Layout Drawing
-
Area/shop front being inspected
-
Frame (Posts, head & base track)
-
Scratch/Paint damage
-
Any adhesive from floor finishes
-
Any paint splashes
-
Joints flush closed up
-
Is the finished floor installed
-
Any excessive gaps to the wall/bulkhead/floor
-
Glass
-
Gaskets installed and fitted well
-
Gaskets cut to allow expansion
-
Free from scuffs/scratches
-
Glazing trims installed
-
Doors
-
Door stops installed
-
Check sliding motion
-
Check thumb turn and key mechanism
-
Ironmongery operates correctly and has all required fixings
-
Electronic locking system prepared
-
Hinges operate correctly & have all the required fixings
-
General
-
All components installed in accordance with the approved drawings
-
All waste and materials cleared off site
-
Works cleaned down and stickers removed and part numbers etc
-
Any other observations to note from the install
-
Keys handed over to client
-
Key Number, Room and sets of keys
-
why no key handed over
-
Any changes to the drawings from installation or client change?
-
Any damage to the works by other trades to note
-
Additional Comments (if applicable)
-
I am happy that the work within this report has been carried out and completed to my satisfaction.
-
Give reason for not signing off
-
Customer Signature
-
Technician Signature