Title Page
-
Photo front of home
-
Conducted on
-
Prepared by
-
House # lot #
Defect list - FORM 6 QBCC SUBSTITUTE (Conditions 19, 28 & 29 of the General Conditions of QBCC New Home Construction Contract)
- Defects
-
What room is defect located that has NOT been rectified prior to handover from original pc inspection ?
- Bedroom 1
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Bedroom 6
- Bathroom
- Powder room
- Ensuite
- Study
- Media Room
- Laundry
- Garage
- Living
- Dining
- Hallway
- Dining
- WIR
- External
- Other
- NOT APPLICABLE
-
Defects below are relevant to following trades
- Concretor
- Carpenter
- Plumber
- Electrician
- Aircon
- Painter
- Tiler
- Plasterer
- Floor layer (vinyl, carpet, hybrid)
- Silicone
- Roofer
- Window coverings (blinds etc)
- Window Screens
- Bricklayer
- Cleaner
- Shower screens, mirrors, vinyl sliders
- Other
- NOT APPLICABLE
-
Photos of defective work (if none use front of house photo)
Questions for Homeowner / representative
-
I am satisfied with my walk through
-
I am satisfied with the backyard
-
Are all lights in working order?
-
Notify electrical contractor
-
Is the aircon remotes on-site and functional
-
Notify ac installer
-
Are all doors functional<br>
-
Notify carpenter
-
I am of understanding the clean is of a builders clean standard and satisfied
-
Client / representative - I agree with all information we have discussed today and agree with defective and non defective work
-
The client or representative is of understanding the relevant timeframes of 45 days post handover that defects on the original inspection have to be rectified, please refer to defect list above
-
I understand the termite protection (annual inspections required)
-
Is their touch up tins on-site full of correct paint and labeled?
- Yes
- No
- N/A
-
Notify painter
-
Have you shown where the main water shut off is
-
Have you shown where the electrical switchboard is located
-
Have you shown where gas isolation valve is if applicable
-
Front door key Number
-
Security door key number
-
Window key number
-
Glass sliding door key number
-
Any additional keys/ laundry/rear garage
-
Letter box key number / if NA write reason (i.e padlock style)
-
Garage door key- have you completed a function test
-
Supervisor sign
-
Client or representative acceptance of handover, understand the checklist and owner acknowledgment in warranty folder section 10 and acknowledge the waver in section 11
-
Any additional photos I.e keys, remotes, ac, garage door, warranty’s, signed warranty forms
-
Back yard Photos x 6 (sides also if not zero lot)
-
Front yard photos x 6
-
Letter box photo x 2 (to show style of letterbox lock)