Title Page
-
Report Type
- Electrical 2nd Fix Handover Report
-
Contract
-
Location
-
Plot No.
-
Conducted on - Year.Month.Day
-
Prepared by
-
Plot No.
-
Plot Media
-
Date & Time
-
Comments
-
Installed by
-
Plot inspected before works commenced
-
Was plot clear and ready to commence
-
All Sockets installed
-
List Items and Location to Items it Applies to
-
All Light Switches installed
-
List Items and Location to Items it Applies to
-
Media Outlet installed
-
Kitchen Sockets installed
-
Multi Gang Switch installed
-
45A Hob Switch and Outlet
-
Dishwasher Socket installed
-
25A Flex Outlet Plates installed
-
Smoke Detectors installed
-
Outlets Level, Secure & Screw Heads Vertical
-
Data & AV Outlets installed
-
List Items and Location to Items it Applies to
-
Thermostats installed
-
All Down Lighters installed
-
List Items and Location to Items it Applies to
-
MCB's installed correct ratings for each circuit
-
CCU Cables Terminated
-
Plot cleared of waste
-
Additional Notes
-
Harrisons
-
Main Contractor