Title Page
-
Project Name
-
Project no.
-
Contractor / WT Team
-
ITR No.
-
Specific task checked
-
Location
-
Conducted on
-
Prepared by
Pre-checks
-
Using latest Door Schedule/drawing/spec.?
-
Rough opening OK? (Size (larger than frame), square, plumb, correct/good/strong substrate)
-
Cavity closer OK? (Correct material, position, fixing, effective seal, without breaks/gaps)
Mid-checks
-
Correct type of frame, door and threshold?
-
Vertical and square? (Jambs plumb and header square to jambs?)
-
Fixings OK? (Correct type (stainless, zinc?) ,at least 4 fixings per jamb, at 600mm cc max? If header is wider than 1100mm are there fixings in the head?)<br>
-
Does handing and active leaf match with the Door Schedule?
-
Features OK? (Window apertures, vents, etc. match door schedule, drawings and spec.)
-
Void between frame and structure OK? (frame central to rough opening; voids filled with suitable material & thickness)
-
1st fix electrical items OK? (Provision made for required electrical systems, as per Door Schedule)
Post-checks
-
Operation OK? (Smooth action; latches easily; door flush with frame lining/doesn't protrude when closed; good weather seal)
-
Hardware OK? (All ironmongery as Door Schedule; ALL screws installed; hardware not under pressure when door closed; closer ensures weather seal; correct lock suite)
-
Features OK? (All plates, glazing, vents correctly installed and undamaged)
-
2nd fix items OK? (Architraves, door stops, glazing beads tightly mitred, neat and installed correctly)
-
Signage OK? (Correct labels: fire exit, push bar to operate, etc)
-
Electrical/Alarm Systems OK? (All required systems installed, checked, tested, signed off - as per Door Schedule, etc.)
-
Flashings and sealants OK? (All flashings fitted and lapped correctly to form a weatherproof barrier ; joints and mitres neat, tight and well sealed. All required sealants applied, neat, tidy and forming weather seal.)
-
General condition OK? (No scratches or damage to door/frame face or arris; all fitting debris cleaned from channels, sills, weepholes)
-
Temporary protection OK? (In place to protect door during rest of project/adjacent work)
-
Photo Report
-
If all items have passed inspection and are ready for handover, please sign below.
-
Inspector's signature
-
WT Site Manager/Overseer's signature
-
Contractor's signature (optional)