Information
-
Document No.
-
Project name
-
Customer
-
Conducted on
-
Prepared by
-
Location
Area information
-
What area is the sign off required for?
-
Specific location (Floor / Building # / Area description)
-
Who released the area for Absolute to begin their scope of work
-
Is the area complete by the other trades prior to Firestopping? (this avoids call backs and delays)
-
Date the area was released to Absolute
Rough in / Floor Stage
-
Ratings reviewed (select all that apply)
- FIRE Ratings (F)
- FIRE & TEMPERATURE Ratings (FT)
- SMOKE Seal ratings
-
Rough in / Floors
Rough in / FLOORS
-
Are the installed PLUMBING penetrations completed?
-
Rough in / Floor, Plumbing Photo
-
Are the installed SPRINKLER penetrations completed?
-
Rough in / Floor, Sprinkler Photo
-
Are the installed ELECTRICAL penetrations completed?
-
Rough in / Floor, Electrical Photo
-
Are the installed ELECTRICAL BOXES items completed?
-
Rough in, Electrical boxes Photo
-
Are the installed DATA penetrations completed?
-
Rough in / Floor, Data Photo
-
Are the installed CURTAIN WALL joints completed?
-
Curtain Wall Photo
Shaft wall stage
-
Shaft Walls
Shaft walls
-
Ratings reviewed (select all that apply)
- FIRE Ratings (F)
- FIRE & TEMPERATURE Ratings (FT)
- SMOKE Seal ratings
-
Are the shaft wall JOINTS completed? (Head of wall, Wall to Wall, and Bottom of Wall)
-
Shaft Wall, Joint Photos
-
Are the installed PLUMBING penetrations completed?
-
Shaft Wall, Plumbing Photo
-
Are the installed SPRINKLER penetrations completed?
-
Shaft Wall, Sprinkler Photo
-
Are the installed ELECTRICAL penetrations completed?
-
Shaft Wall, Electrical Photo
Wall stage
-
Final / Walls
-
Ratings reviewed (select all that apply)
- FIRE Ratings (F)
- FIRE & TEMPERATURE Ratings (FT)
- SMOKE Seal ratings
-
Are the installed PLUMBING penetrations completed?
-
Final / Walls, Plumbing Photos
-
Are the installed SPRINKLER penetrations completed?
-
Final / Walls, Sprinkler Photos
-
Are the installed ELECTRICAL penetrations completed?
-
Final / Walls, Electrical Photos
-
Are the installed DATA penetrations completed?
-
Final / Walls, Data Photos
-
Are the STRUCTURAL PENETRATIONS completed?
-
Final / Walls, Structural penetrations Photos
-
Are the HEAD OF WALL joints completed?
-
Final / Walls, Head of wall Photos
-
Are the WALL TO WALL / VERTICAL joints completed?
-
Final / Walls, Wall to Wall Photos
-
Are the BOTTOM OF WALL joints completed?
-
Final / Walls, Bottom of wall Photos
Signatures / Turn over
-
Items requiring action
-
This document indicates that Absolute has completed their scope of work for the indicated areas above. Should Absolute be required to return to this area, time and materials charges may apply.
-
Customer name & signature
-
Absolute employee name & signature