Information
-
Document No.
-
Client
-
Project Name
-
Location
-
Conducted on
-
Construction Stage?
Installation
Installation
-
What is the application?
-
Photo of installation
-
Installation progress
-
Detailed location of installation (Floor level, room #, location in room, etc)
-
Penetrating item?
- Metal pipe or Conduit
- Combustible pipe (vented)
- Combustible pipe (process/closed)
- Cables
- Cable tray
- Insulated pipe
- Electrical busway
- Duct
- Structural item
- Multiple items
-
Rated assembly?
- Gypsum wall
- Wood Floor
- Concrete Floor
- Block Wall
- Q Deck
- Hambro
- Curtain wall
- non rated roof
-
Assembly rating
-
Tested and listed system number / Engineered Judgment number?
-
Correct Products used?
-
Correct depth of product?
-
Annular Space within tolerance?
-
Mineral wool depth?
-
Mineral wool compression?
-
Overall Application rating?
-
Corrective Actions / notes
-
Photo of installation
-
Detailed location of installation (Floor level, room #, location in room, etc)
-
Installation progress
-
Rated assembly 1?
- Gypsum wall
- Wood Floor
- Concrete Floor
- Block Wall
- Q Deck
- Hambro
- Curtain wall
- non rated roof
-
Rated assembly 2?
- Gypsum wall
- Wood Floor
- Concrete Floor
- Block Wall
- Q Deck
- Hambro
- Curtain wall
- non rated roof
-
Joint rating
-
Tested and listed system number / Engineered Judgment number?
-
Correct Products used?
-
Correct depth of product?
-
Joint width within tolerance?
-
Mineral wool depth?
-
Mineral wool compression?
-
Overall Application rating?
-
Corrective Actions / notes
-
Site review conducted by: