Information

  • PID:

  • Council's engineering officer

Access Inspection

  • Has a inspection be completed?

  • What time will the inspection be done?

  • And by who?

  • Inspected by:

  • Time of inspection

ROAD

  • Is the Kerb and Gutter/open drains in good condition?

  • Is the road in good condition?

  • Road construction type

ACCESS AND DRIVEWAY

  • How many accesses is there?

ACCESS 1

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 1

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Is a culvert required?

  • Is it seal to the lot proper?

ACCESS 2

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 1

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 2

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 3

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 1

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 2

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 3

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 4

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 1

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 2

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 3

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 4

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

ACCESS 5

  • Location of access
  • Is it a single access or double width access

  • Is the development able to achieve sight distance

  • Does the access comply with Council's required gradients

  • Type of access

  • Does the access comply with KSD 1-07

  • Is the access concrete

  • Does the access need comply with KSD 2-02a

  • Is a culvert required?

  • Are head walls required?

  • Is it seal to the lot proper?

FOOTPATH

  • Is there a footpath?

  • Footpath construction type

  • Is there footpaths and do they comply with KSD's?

  • Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.