Title Page
-
Project Name
-
Location
-
Inspection Location
-
Date
-
Client
-
Project Manager
-
Prepared By
-
TW design brief for tower up/timber access steps is in the TW file?
-
TW design check certificate of tower up/timber access steps in the TW file?
-
Which codes of practice used for tower up/timber access steps design?
-
What category is the design?
-
Designer calculation of tower up/timber access steps are in TW file?
-
Is the TW drawing of tower up/timber access steps issued for construction?
-
Is the TW drawing recorded in TW register?
-
Are the tower up/timber access step elements being setup as per designed drawing, manufacturer guides and specifications on site?
-
Has the permit to access issued?
-
Inspection checklist on daily – Visual Inspected and weekly- written recorded in TW file?
-
Permit to strike issued before the strike?