Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Workplace Inspection
Site Establishment
-
Amalgamated signage - QBCC info
- Yes
- No
- N/A
-
Amalgamated signage - Contact details
-
Site security (Workplace secure from public)
-
Access / Egress paths clear
-
Exclusion zone / prohibited areas warning signs displayed
-
First aid kit
-
Fire extinguisher/equipment
-
Site Paperwork
-
Risk assessment completed by Supervisor
-
Risk assessment signed by all workers
-
SWMS site specific for all high-risk activities
-
SWMS signed by all relevant workers
-
Pre-start toolbox talk
High Risk Activities Identified
-
High Risk activities
- Risk of a person falling two metres or greater
- Workplace with Powered Mobile Plant
- Confined spaces
-
Workers have required licenses and training
-
Appropriate signage displayed
-
Exclusion zones installed and sufficient
-
Fall-arrest equipment being used
-
Exclusion zone installed
-
Exclusion zone being monitored
EWP's
-
Type of EWP
-
Plant daily logbook completed
-
Exclusion zone installed and adequate
-
Warning signs displayed
-
SWMS being followed
Work at Height
-
Edge protection
-
Fall-restraint
-
Fall-arrest
-
Tethers and lanyards being used
-
Falling objects protection below
Housekeeping
-
Storage area for materials and equipment
-
Storage area signage displayed
-
Storage area well lit
-
Bins available and being used
-
Rubbished stacked and areas kept clean
-
Drop sheets and equipment away from paths and doorways
-
Leads suspended/trip hazards removed
Behavior / Standards
-
Company uniform being worn
-
UV radiation protection
- Sunscreen
- UV clothing
- Wide brim hat
- Tinted glasses
- Task rotation (away from direct sunlight)
-
Company policies being followed
- Sunscreen
- UV clothing
- Wide brim hat
- Tinted glasses
- Task rotation (away from direct sunlight)
Equipment and Electrical
-
Electrical items tagged and in-date
-
RCD's being used
-
Guards fitted to equipment
-
Handles fitted to equipment
-
Correct tools for the task
Scaffold
-
Scaffold (fixed) complete with handover certificate attached
-
Scaffold (fixed) inspected every 30 days
-
Scaffold inspected - adequate for access
-
Scaffold prevented from unauthorised access
-
Mobile scaffold - installed correctly
-
Trestle and planks - installed correctly
Manual handling
-
Mechanical aids available
-
Enough workers for the task
-