Information

  • Principle contractor site Manager

  • AGL Project Manager for this site

  • Toolbox talk carried out by

  • Toolbox talk carried out on

  • Location

Section Name

  • Risk Assessments and Method Statements
    Overview This talk will cover: what risk assessments and method statements mean to you.
    Risk assessments
    1 All employers have a legal duty to prepare risk assessments for work activities that could foreseeable result in injury to people or damage equipment.
    2 Risk assessments outline the ways in which the job could result in injury or damage and the measures put in place ensure that the chance of anything going wrong is eliminated or reduced to an acceptable level.
    3 Employer with five or more employees must have written risk assessments.
    4 If there are less than five employees, the risk assessments must still be carried out although there is no legal duty to write them down
    5 Employers also have a legal duty to communicate the findings of the risk assessment to operatives who may be affected by it.
    6 Therefore, depending upon the size of your company, you should either be told, or be asked to read, what the risks and control measures are for each job that you carry out.
    7 There is no specified way for laying out a risk assessment so you must familiarise yourself with the way your employer lay out theirs.
    8 In many cases, the risk assessments are part of the method of statement.
    Method statements
    1 Method statements are a written list of operations, to be carried out in a specified sequence, in order to complete a work activity in a safe manner.
    2 Everyone involved in a job which a method statement has been written should read it and sign as having done so.
    3 Well-written method statements address all the hazards present and plan the work so that the risk of accident is eliminated or reduced to an acceptable level.
    4 Most method statements also include the risk assessments for the same job so that the operative can read what hazards have been considered and how the risk of accidents have been overcome.

  • Toolbox talk complete?

  • Now go to section "Toolbox talk attendee register"

Toolbox talk attendee register

  • Toolbox talk attendees -

  • Engineer -
  • Have you fully understood this toolbox talk?

  • Please report to your supervisor to discuss your concerns.

  • Name of engineer -

  • Signature -

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.