Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Service Visit Type

  • Location

  • Plant Description

  • Asset Reference

RAMS

  • Risk assessment completed

  • Method statement completed

  • PPE

  • Engineer Initials

SFG 20 Procedure - Air Handling Units (3M)

Unit Filters

  • Check manometer reading and renew filter media as<br>indicated.

  • Check for condensate carry-over and that drains are clear.

  • Air should be vented from heating and cooling coils where<br>fitted.

  • Check motors operational

  • Damper and guide vane pivots and linkages - Lubricate lightly.

  • Motorised damper - Check to see that louvers are clear and not obstructed, couplings are secure and that motor runs without excessive noise or vibration.

  • Controls and electrical connections - Check operation and<br>condition.

Additional Comments

  • Report of any faults

Safety checks

  • Inspection Completed

  • Area left safe

  • Area left clean

Polyteck Building Services, 143 Leman Street, London, E1 8EY

  • Engineer signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.