Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Service Visit Type
-
Location
-
Plant Description
-
Asset Reference
RAMS
-
Risk assessment completed
-
Method statement completed
-
PPE
-
Engineer Initials
SFG 20 Procedure - Air Handling Units (3M)
Unit Filters
-
Check manometer reading and renew filter media as<br>indicated.
-
Check for condensate carry-over and that drains are clear.
-
Air should be vented from heating and cooling coils where<br>fitted.
-
Check motors operational
-
Damper and guide vane pivots and linkages - Lubricate lightly.
-
Motorised damper - Check to see that louvers are clear and not obstructed, couplings are secure and that motor runs without excessive noise or vibration.
-
Controls and electrical connections - Check operation and<br>condition.
Additional Comments
-
Report of any faults
Safety checks
-
Inspection Completed
-
Area left safe
-
Area left clean
Polyteck Building Services, 143 Leman Street, London, E1 8EY
-
Engineer signature