Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Plant risk assessment has been conducted and plant inspected as fit for purpose prior to utilising on site. <br>Critical Risk Ref. 2.1
-
A plant register is available (or similar system), listing all mobile plant on site, with next scheduled service/maintenance indicated.<br>Critical Risk Ref. 2.6
-
Earth moving machinery has been fitted with compliant roll over protection and falling object protection, unless risk assessment has been demonstrated that they are not reasonably practicable.<br>Critical Risk Ref. 2.2
-
Daily pre-start inspections have been completed for all operating mobile plant, with any deficiencies listed and actioned for repair/replacement.<br>Critical Risk Ref. 2.6
-
Conduct interview to ensure supervisors and plant operators aware of the requirements for mobile plant on boarding and ongoing inspection.<br>Critical Risk Ref. 2.6
-
Subcontract conditions for contractors operating mobile plant on site include the requirements for ensuring plant is in good condition and is inspected and maintained by a competent persons in accordance with the OEM's requirements.<br>Critical Risk Ref. 2.6
-
Mobile plant utilised on site is witness to be in good working order and is suitable for the work activity conducted, including lights/safety warning devices, tyres, seat belts, mirrors.<br>Critical Risk Ref. 2.3 & 2.6
-
Plant movements are complaint with the traffic movement requirements for the site and include positive communications.<br>Critical Risk Ref. 8.1
-
Load moving equipment (forklift, frannas, excavators) is being utilised appropriately; loads are secure.<br>
-
Load moving equipment - safely operated (speed, seatbelt, warnings etc.) as per traffic movement requirements.<br>Critical Risk Ref. 8.1
-
Mobile plant and vehicle operators always find a stationary position in a safe place prior to handling a mobile phone.<br>Critical Risk Ref. 2.5
-
Mobile plant is always switched off and braking mechanisms are applied before being left unoccupied.<br>Critical Risk Ref. 2.7
-
High risk plant operators competency has been assessed; sighting evidence of VOC undertaken as a part of licensing requirement.
-
High risk plant operators competency have been assessed; sighting a current VOC certificate supplied by a approved RTO
-
High risk plant operators competency have been assessed; undertaking a VOC assessment by an approved assessor.