Information

  • CONTRACTORS LIC#665826

    Allbright LOGO Blue Green A on Top copy.png
  • EXTERIOR PROPOSAL/AGREEMENT


    Prep Work: Trained, uniformed and background checked employees will perform the following using the PDCA Standards prep level 2.
    Pressure wash. Mask. Sand to remove loose and peeling paint, Caulk joints. Fill holes and detailed patching (up to 1/8 surface profile difference). Apply primer to repaired or glossy surfaces.


  • Select date

  • Prepared by

  • Client Name:

  • Client Phone Number:

  • Client Email:

  • Address:

SCOPE OF WORK/AREAS TO BE PAINTED

  • CONTRACTORS LIC#665826

    Allbright LOGO Blue Green A on Top copy.png
  • STUCCO

  • SIDING

  • WOOD FASCIA

  • EAVES (SAME AS BODY)

  • EAVES (SAME AS FASCIA)

  • WOOD TRIM

  • PATIO COVER

  • WROUGHT IRON

  • PERIMETER FENCE

  • WINDOW POP-OUTS

  • GATE(S)

  • SHUTTER(S)

  • RAIN GUTTER(S)

  • FRONT DOOR(S)

  • GARAGE DOOR(S)

  • # OF DOORS INCLUDED:

  • # OF WINDOWS INCLUDED:

  • Other/Notes:

ADDITIONAL NOTES/SIGNATURE PAGE

  • CONTRACTORS LIC#665826

    Allbright LOGO Blue Green A on Top copy.png
  • All work to be completed in a workmanlike manner according to PDCA standards & practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will be an extra charge over and above the above estimate.

    PAYMENTS: No deposit upon signing
    1. 50% progress payment
    2. 100% paid upon completion

  • ADDITIONAL NOTES:

  • THIS PROPOSAL DOES NOT INCLUDE(OPTIONAL):

  • LABOR AND MATERIAL TOTAL:

  • WARRANTY OPTIONS (SEE WARRANTY DOCUMENTS AT WWW.ALLBRIGHTPAINTING.COM)

  • 2-Year Labor Warranty against chipping and peeling. Excludes: horizontal surfaces, cracks, sun or water damage. No mid-term inspection

  • 6-Year Labor Warranty against chipping, peeling, cracks, sun or water damage. Includes: A lifetime paint material replacement warranty from the manufacturer + a mid-term inspection and touch ups from the ALLBRIGHT Painting Happiness Team!.

  • ACCEPTANCE SIGNATURE

  • Acceptance of proposal, the above prices, specifications and conditions are satisfactory and are hereby accepted

    You, the Buyer, may cancel this transaction at any time prior to midnight of the third business day (in the case of disaster repairs, seventh business day) after the date of this transaction. You, the homeowner (buyer) or tenant have the right to require the contractor to have a performance and payment bond, or funding control approved by the registrar of contractors. The cost of this bond may be paid by the owner.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.