Title Page
-
PO#
-
Client Name:
-
Crew Leader Name:
-
Address
-
Date:
-
Inspection Prepared by: (Enter your name)
-
Document No.
The Show
Trucks/Vans
-
Are all doors closed and locked (if needed)
-
Is the exterior of the van clean?
-
Is the interior clean and organized?
Job Site
-
Is there a yard sign onsite?
-
Please insert picture.
-
Is the job site clean & neat?
-
Please insert picture.
-
Is there a shop set up?
-
Please insert picture.
Work Areas
-
Are all required floors/areas properly masked?
-
Please take a few pictures for our records.
-
Are all work activities being managed safely?
Crew
-
Have all employees been introduced to the customer?
-
Are all employees properly uniformed (neat & clean appearance?)
-
Are their any employees missing their names on their shirt?
-
Please write which employee is improperly uniformed.
-
Do all employees have their grip on hand?
-
List employees that do not have their grip:
The Job
-
Did you discuss the contract and scope with Sales prior to the pre job walk?
-
Can a crew member confirm the daily huddle?
Documentation
-
Was the work-site built before 1978?
-
Are proper Lead-Safe precautions being practiced?
-
Is the job hour tracking up to date on smartsheets?
-
If no, state reason:
-
Has the Crew Leader completed the previous job's color schedule?
Renovation, Repair, and Painting Rule. (EPA RRP)
-
Is this project a pre-1978 housing or child occupied facility?
-
Might we disturb more than 6 square feet of the previously painted surface?
-
Does the RRP Rule apply? The RRP rule applies to "Target Housing" and "Child-Occupied Facilities."
Definition: Target Housing- is a house or apartment (including mobile homes) built before January 1, 1978 except for: 1) 0-bedroom units (like dorms or studio apartments) 2) housing that is officially designated for the elderly or the handicapped 3) housing that has been tested by a State Certified Lead Inspector and found to be free of lead-based paint.
Definition: Child Occupied Facility- is a building, or portion of a building, constructed prior to 1978, visited by the same child, 6 years of age or under, on at least 2 different days within any week, provided that each day's visit lasts at least 3 hours, the combined weekly visit lasts at least 6 hours, and the combined annual visits last at least 60 hours. Such facilities may include, but are not limited to, day-care centers, preschools and kindergarten classrooms. -
Does this project fall under the EPA RRP Ruling?
Quality
-
What level of surface preparation is on the contract?
-
Take a few pictures:
-
Does the quality of work that is being done, match what was sold?
-
Why not?
Safety
-
Is there a safety bin placed properly on site?
-
Why not?
-
Is there a fully charged fire extinguisher?
-
Is there a fully stocked first aid kit?
-
Is there a safety binder with up to date IIPP?
-
Have safety hazards been identified and addressed?
-
If safety hazards are present, please write them here:
-
If safety hazards are present, please take pictures:
-
Have manual lifting and handling tasks been properly assessed? (moving large ladders & equipment)
Personnel Protective Equipment (PPE)
-
Is required fall protection being used?
-
Are safety glasses, fall protection, proper footwear(boots) and masks being used?
-
Are all site personnel compliant with the site required PPE?
Concusion
-
Is all trash from work site properly disposed?
-
Are sprayers "clean" & maintained? Please observe housing & snorkel.
-
Add media
-
Crew Leader Signature