Information
-
Client Name
-
Audit Frequency
-
Document No.
-
Conducted on
-
Prepared by
-
Site Address
-
Special Notes
MAINTENANCE SPECIFICATION
-
"Sign In" on arrival at site (Rakon Contractor Log)
-
Check CO₂ Compound is clear of rubbish & leaves
-
Check Air Conditioning cages are clear of rubbish & leaves
-
Grass cutting
-
Keep site boarders free from weeds & 'garden triangle' tidy
-
Trees (cut back any unwanted growth of small branches)
-
Litter pick (all external areas)
-
Clear fallen leaves
-
Moss control (car park & pathways)
-
Sweep car park kerb lines & bin area
-
Sweep paths by all doors & Fire Exits
-
Weed spraying (all site)
-
Complete Alliance Cleaning "Job Sheet" (email to Alliance Cleaning)
-
"Sign Out" before vacating site (Rakon Contractor Log)
-
Clean Rakon Car Park sign (Alberto to do on Window Clean visits)
COMPLIANCE MATTERS
-
Auditor Signature
-
Customer Signature