PASMA ACCESS TOWER INSPECTION REPORT
-
Report of Inspection of an Aluminium Tower as required by section 29 & 30 of the Construction (Health,Safety &
-
Welfare ) Regulations 1996 (schedules 7 & 8 )
Schedule 7
Timing of Inspection:-
-
1. Before being used on site for first time
-
2. After any manufactured approved addition to the company's scaffold
-
3. After any noted damage
REPORT
-
1. Name of Company Inspection to be carried out for
-
2. Location of the site scaffold to be inspected prior to use
-
3. Description of site (ground conditions,any obstacles)
-
4. Date & Time of Inspection
-
5. Details of any damages/parts missing that could cause a risk to the user
-
6. Details of any action taken identified 5
-
7. Name & Position of PASMA Qualified Inspector making this report
-
Signature
-
PASMA
-
Certificate No
-
One copy to be retained by signatory, the other to be given to whom the inspection was carried out for