Title Page
-
Site conducted
-
Site Manager
-
Conducted on
-
Location
-
Subcontractors:
-
Number of Personnel on site
Serious H&S or Environmental Breaches
-
Are there any Serious H&S Breaches on site
-
Working in an area with no edge protection in place i.e. a roof, a roof of a vehicle, formwork deck or terrace
-
Untaking works outside the protection of a double-handrailed/ boarded out area when on a scaffold
-
Untaking works on a scaffold that is not tagged or erected corrected or incomplete, fall from height hazard exist
-
Untaking an unsafe lifting operation where there is a risk of failure of a suspended load
-
Working under suspended load/ Breaching lifting exclusion zones
-
Unsecured Ope or Manhole left unprotected?
-
Risk of falling materials - unsecure vertical storage of materials
-
Persons entering a live manhole/ chamber or tank with the required training and confined space apparatus
-
Use of a grinder, consaw, chop saw or other cutting equipment without correct eye protection being in place (Safe googles - impact resistant)
-
Removal of guards or handles on plant e.g. grinders
-
Operating items of plant without the correct CSCS card or in a manner that could cause serious harm
-
Failure to wear seatbelts when operating plant
-
Persons working in excavations where there is no safe means of access/ egress provided
-
Operating a boom lift MEWP without 100% tie-off and correct work restraint lanyard
-
Persons found on site having not received the manadatory site induction. Without Safepass and Manual Handling training?
-
10% or more personnel on site not complying with the manadatory wearing of PPE (Safety Boots/ Hardhat/ High Vis) Safety Gloves Glasses and Hearing Protection where Required
-
Poor Access/ Egress. Lack of adequate control for plant pedestrian interface.
-
Poor houskeeping in more than 3 locations
-
Observation of Environmental breach on site. Spill of hazardsous substance. Unsecure/ Unbunded storage of chemicals/ Contamination of muck away
Site Safety Audit
- Public Interface & Signage
-
Is the site secured to prevent unauthorised access in all areas?
-
Condition of pubic road/ pathways - Clean & free from trip hazards
-
Has everyone accessing the site signed in and out daily
-
Is there adequate signage in welfare areas (H&S Policy/ Site Rules/ Emergency Contact/ Wellbeing Posters)
Housekeeping & Access
-
Is there a good level of housekeeping on site with no materials, debris or cables causing trip hazards.
-
Are there adequate supplies of skips and bins available. Do all bins and skips have clear signage in place.
-
Is there safe access and egress throughout the site.
-
Lighting Levels - sufficient in all areas, is task lighting available where required
Work At Height
-
Plan for Work At Height - is the safest equipment in use? Ladders must only be used in restricted areas where safer alternatives cannot be used.
-
Personnel trained in WAH and where required appropriate, safe use of harnesses etc
-
Ladder Safety - If used - Are ladders in good condition, free from defects, not painted on. Footed or tied off at all times?
-
MEWPs operated by trained operators, spotter in place if required. Rescue plan in place. Safe practice when operating MEWPs?
-
Edge Protection - Are all open edges protected to guard against fall of persons ?
-
Exclusion zones in place under relevant WAH equipment
-
Scaffold/ Alloy towers erected by trained personnel
-
Alloy Towers tagged and inspected, in good visual condition and wheels locked when in use?
-
Scaffold Check - Tied adequately to prevent Collapse. Scaffold boards and components in good visual condition
-
Scaffold - Are all access and working scaffolds tagged and in date?
-
Scaffold - Temporary Works designs in place for non standard scaffold
-
Are weekly inspections for Work At Height Equipment completed i.e. GA3 completed and Scaff tags updated.
Excavation Safety
-
Permit to dig in place and control measures being followed
-
Position of live services marked on the surface with surveys undertaked by CSCS LUG Operatives
-
Appropriate warning signage in place
-
Safe access/ egress to excavation base; i.e steps with handrail or tied off ladder
-
Physical barried in place to prevent risk of falling persons
-
Excavations adequately steped/ battered and compliant with Code of Practice
-
Spoil stored minimum of 1.5 meters back from excavation or equal to the depth of trench whichever is the greater - must comply with code of practice
-
Have weekly inspections for excavations of > 2M been completed (AF3)
Formwork/ Concrete Safety
-
Are there adequate exclusion zones in place when erecting formwork or pouring concrete
-
Formwork system pouring platform complaint with WAH regarding safe access/ egress and edge protection
-
Are all exposed rebar ends capped where required
Lifting Operations
-
If required is there a lift plan/ method statement in place
-
Trained Slinger/ Signaler in place with correct CSCS ticket. Safe practices observed, use of taglines etc.
-
Is lifting taking place near overhead lines or excavations. Is there sufficient space?
-
Are there thorough examination certifications (GA1) in place for all lifting appliances (e.g cranes) and lifting accessories (Chains, block grabs, skips, jib etc)
Equipment & Electrical Safety
-
Electrical tools/ cables in good visible condition. Good cable management in place?
-
Only 110v equipment in place & inspected annually by training competent person (PAT Testing)
-
Compressed air tools used and stored correctly
Fire & Emergency
-
Fire Points - is there an adequate number of serviced extinguishers, signage and means of raising alarm?
-
Fire Marshal - Is there a trained fire marshal on site?
-
Is hot work permiting system being followed adqeuately? Fire Prevent measures in place/ no combustiles in the area where hot works are occuring
-
Is secure chemical storage in place on site. Hazardous materials being stored in accordance with MSDS information?
-
Evacuation - Have procedures been tested (e.g. fire or emergency drill in past 6 months)
-
Smoking - Is smoking well controlled on site?
-
If gas canisters are present are they stroed secuely on site away from main buildings
-
Is there a trained first aider on site - easily identifiable with helmet sticker
-
Adequate First Aid Supplies - Eye Wash, first aid kits
-
Have there been accidents/ near misses on site since last audit
Safety Documentation
-
Are there induction records on file for all site personnel with relevant training records
-
Have all staff working on site been briefed and signed onto an approved RAMS.
-
Is there evidence of staff consultation - TBT Records/ Daily Whiteboards/ SPAs
-
Is permitting system being followed correctly. Evidence of old permits being closed off
-
Are there thorough examination certificates for plant on file (GA1s) Forklift Teleporter ,Track Lifts etc
-
Have weekly inspecftions been completed for all plant & equipment (GA2s)
-
Temporary Works - TW register up to date, TW designs in place, Inspections of TW completed
-
KML Key Safety Documentation being maintained - KML Safety Plan, Emergency Response Plan, Traffic Management Plan/ AF2 (all in date)
PPE Compliance
-
Are all personnel wearing mandatory PPE? Is PPE in good condition and being worn correctly?
-
Is suitable grade eye protection used when required (e.g. impact resistant goggles)?
-
Respiratory Protection (RPE) - Correct type worn for works being undertaken. Operatives trained and have face-fit testing in place?
-
Are all operatives working with concrete wearing correct PPE, gloves and eye protection in place
Occupational Health
-
Noise Can noise be reduce by different working methods or selecting quieter plant?
-
Noise Are people not involved in the work kept away from sources of noise. Is adequate hearing protection available and in use?
-
Manual Handling Is mechanical means in use where possible for moving materials. Use of teleporter or other manual handling aid
-
Manual Handling Are all operatives trainined in safe manual handling practices
-
Dust Is exposure to dust being managed correctly. Is there on-tool dust extraction, dust suppression measures etc.
-
Vibration: Is exposure to Hand Arm Vibration/ Whole Body Vibration reduced as much as possible by work methods and plant selection
-
Stress. Are operatives aware of Lighthouse Charity/ Construction Industry Supports, Employee Assistance Programmes & Mental Health First Aiders
-
Workplace Wellbeing. Good signage in place of health campaigns/ smoking ceasation/ Men's cancer/ Mental Health Awareness
Any Other Observation
-
Indicate any other observation (positive or negative) that is not covered above in the following box.
Summary of inspection
-
undefined
Sign Off
-
Name of Inspector
-
Signed
-
Date