Title Page
-
Conducted on
-
Prepared by
-
Location
Store / Site detail
Site Detail
-
Client
-
Site
-
Store number
-
Trainer
-
ALS Equipment / System
- ALS 01
- ALS 02
- ALS H36
- ALS MVX One way
- ALS MVX Two way
- Other
- Checkouts
- Trolley conveyor system
-
Tube Size
- 63mm
- 90mm
- 110mm
- 160mm
- 200mm
- Other
-
Add the system / service details
System Equipment Detail
System Equipment Detail
-
System type
- ALS 01
- ALS 02
- ALS H36
- ALS MVX One way
- ALS MVX Two way
- Other
- Checkouts
- Trolley conveyor system
-
Add the detail of the system / service here
-
Describe the devices and main components of the tube system
-
Explain how the system works
-
Demonstrate and explain the importance of loading the carrier and ensuring the cap/lid is fully secure
-
Demonstrate how insert the carrier into the station
-
Demonstrate the indication LED and how they show the system status.
-
Demonstrate how to safely remove a carrier from a receive station
-
Demonstrate how to recover a carrier from the system if one is suspected to be lodged in the system
-
Demonstrate the Level one functions of the controller
-
Add the Make and model of the Checkout
-
Demonstrate safety features and the reset process of the conveyor belt
-
Demonstrate additional functions if applicable
-
Add detail of additional function
-
Add the Make, model and length of the Trolley conveyor.
-
Describe the devices and main components of the trolley conveyor system
-
Explain how the system works
-
Demonstrate the safety features and the reset function of the conveyor
-
Demonstrate and explain the importance of correct loading the trollies carts into the conveyor system
-
Demonstrate how to manually control the electrical motors and trolley stops from the main control panel
-
Explain the weekly, monthly, annually system checks required to keep the conveyor in good working order
-
Demonstrate a single trolley and multiple trolley through the conveyor
Attendees
System training attendees
-
Enter name and department/title
Personel
-
Name
-
Department / Title
Sign off
-
I the undersigned have carried out the full staff / operator training of the system detailed in this document and have recorded the results truthfully and to the best of my ability.