Title Page

  • Client / Contractor

  • Site / Depot

  • Inspection by

  • Date & Time

  • Location

Site Inspection & Surveillance Records

  • banner.jpg
  • Instructions

    1. Identify the Risk Factors by either "Satisfactory"; "Low"; "Low / Medium"; "Medium"; "Medium / High" or "High" for the questions below
    2. After identifying the risk factors, select Action that is applicable to each item.
    3. To add a notes, images or assign corrective actions, click on the paperclip icon then "Add Action"; provide a description, assign to a member, set priority and due date
    4. Complete audit by providing digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link

  • ill1.jpg

1. Site Documentation

  • 1.1 Construction Phase Plan (Copy on site, signed off..)

  • Action

  • 1.2 Health & Safety Policy (Displayed, signed off)

  • Action

  • 1.3 F10 (Displayed, up to date..)

  • Action

  • 1.4 Emergency Contact List

  • Action

  • 1.5 Insurance (ELI) (Displayed, In date..)

  • Action

  • 1.6 Law Poster (Displayed, sections completed)

  • Action

  • 1.7 Risk Assessments

  • Action

  • 1.8 WPP / TB / MS

  • Action

  • 1.9 Permits (hot Works, C Form, Dig )

  • Action

  • 1.10 Inspection Registers ( Statutory Registers)

  • Action

  • 1.11 Sub-Contractor documentation

  • Action

  • Comments

2. Monitoring

  • 2.1 Fire Control

  • Action

  • 2.2 First Aid

  • Action

  • 2.3 Tool Box Talks

  • Action

  • 2.4 Welfare Facilities

  • Action

  • 2.5 Competence

  • Action

  • 2.6 Induction

  • Action

  • Comments

  • 3.1 SSOW (Briefing, Protection arrangements, signed off etc)

  • Action

  • 3.2 Sentinel Checks (Validity, Sponsor, Competence)

  • Action

  • 3.3 WPP / TB (Briefing, compliance etc.)

  • Action

  • 3.4 Access Points

  • Action

  • 3.5 COSS Performance (Briefing, work group control)

  • Action

  • 3.6 ES Performance (COSS briefing..)

  • Action

  • 3.7 OLE / OTP / ALO / CC – MC

  • Action

  • 3.8 Emergency Arrangements

  • Action

  • 3.9 Life Saving Rules ( Communication, Compliance..)

  • Action

  • Comments

4. Work Task Performance

  • 4.1 PPE (Compliance)

  • Action

  • 4.2 Work at Height (Access, Falls, Edge Protection..)

  • Action

  • 4.3 Housekeeping

  • Action

  • 4.4 COSHH (Hazardous / Flammable substances)

  • Action

  • 4.5 Security

  • Action

  • 4.6 Buried / Overhead Services

  • Action

  • 4.7 Signage

  • Action

  • 4.8 Electricity (PA Test, Trailing Leads..)

  • Action

  • 4.9 Work Platforms (Towers, Scaffolds, MEWP’s..)

  • Action

  • 4.10 Noise / Vibration (safe use, assessment..)

  • Action

  • 4.11 Excavations (Guarded, exclusion zones, inspected)

  • Action

  • 4.12 Access & Egress Routes (Signed, Clear of obstruction..)

  • Action

  • 4.13 Asbestos (Register, survey, training..)

  • Action

  • 4.14 Manual Handling (Assessment, technique..)

  • Action

  • 4.15 Abrasive Wheels (safe use, PPE, training..)

  • Action

  • 4.16 LOLER / Lifting (RAMS, lift plan, inspection, TE, competency..)

  • Action

  • 4.17 Confined Spaces (permits, RAMS, competency..)

  • Action

  • 4.18 Plant / Equipment (PUWER..)

  • Action

  • 4.19 Other – State: Foul weather clothing

  • Action

  • Comments

5. Environmental / Ecology

  • 5.1 WPP / TB / MS (Reference to Environment / Ecological performance)

  • Action

  • 5.2 Waste (In accordance with WPP/TB/MS, segregation, skip ID..)

  • Action

  • 5.3 Ecology (Briefings, habitats, surveys..)

  • Action

  • Comments

6. Management / Supervision

  • 6.1 Is management structure clearly defined and understood?

  • Action

  • 6.2 Is a management organogram displayed?

  • Action

  • 6.3 Are on-site management meetings held and attended?

  • Action

  • 6.4 Are statutory registers completed and supervisor inspections carried-out weekly?

  • Action

  • Comments

7. Surveillance

  • 7.1 Does member of staff have the necessary competencies to work on the equipment in their area?

  • Action

  • 7.2 Has all new work been carried-out / completed to the requirements of the appropriate standards?

  • Action

  • 7.3 Have the correct tools / equipment been used to undertake the work?

  • Action

  • 7.4 Have all the records been completed and signed off correctly?

  • Action

  • Comments

Inspection & Surveillance Completion

  • Inspector's Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.