Information
-
Audit
-
Document No.
-
Audit Title address and meter no
AUDIT SUMMARY
-
Other
-
New connection
-
Work Group
-
Location
-
DATE / TIME
-
Task or Activity
-
UED Network
-
AUDITOR/S
United Energy Site Risk Assessment
Job Safety Assessment/Control Measures Taken
-
Any Hazards Identified?
PPE
-
Correct Tools/Equipment to perform the task?
FIELD INSPECTION
-
METER NO:
-
AMI SEAL NO:
METERING
-
1. Has the correct meter been installed at the correct address?
-
2. Has the correct meter been installed for the installation?
-
3. Has the meter been installed at correct level and height?
-
4. Has metering equipment been firmly secured to the board and or structure?
-
5. Have all tamper seals been installed on metering equipment? (Meter, links, fuses)
-
If no for any of the above then select response below.
-
6. Have the correct fasteners been used to secure metering equipment?
-
7. Is the metering equipment in good working order? E.g. links, fuses, panel.
-
8. Is the condition of the meter board / panel acceptable? <br> (does it require to be identified as a defect)<br>
-
9. Is the condition of the customer meter enclosure acceptable? (does it require to be identified as a customer defect)
-
11. Has the IP rating of the meter cabinet been maintained? (When antenna installed)
-
12. Has meter commissioning requirements been completed?
-
13. Have terminal connections been secured firmly?
-
15. Has meter been checked for correct functionality, programming, type, SIR compliance etc.
-
Does the metering installation comply with current SIR's?
Work Practices
Work practises
-
Has Asbestos been identified and steps, procedures followed?
-
16. Has all unused metering cables been removed or terminated?
-
17. Has all unused metering equipment been removed?<br>(e.g. time switch)<br>
-
18. Has non compliant meter wiring been identified as a customer defect?
-
19. Has the work site been left tidy?
Communications
-
20. Was the householder notified by the installer of meter exchange prior meter exchange?
-
21. Was the customer / occupier notified of meter exchange?<br> (by mail)<br>
-
22. Was an information card lift on site for the customer/ occupier?
Testing
-
23. Has site passed NST on all phases?
-
24. Has the load test verified the correct connection of line and load cables on all phases?
-
25. Is phase rotation verified correct?
-
General Comments
-
Signature: Auditor:
Number of Non-conformance/Observation