Information

AUDIT SUMMARY

  • Document No.

  • Prepared by

  • Post audit

  • Number of non conformances

  • Audit Address

  • Meter no

  • Seal no

AUDIT TYPE

  • AMI install

  • Other

  • UED NETWORK

  • Other

  • Formway

  • Other

  • DATE / TIME

United Energy Site Risk Assessment

Job Safety Assessment/Control Measures Taken

  • Any Hazards Identified?

JSA

  • Precautions taken to remove hazards

  • Correct Tools/Equipment to perform the task?

  • Is the correct PPE available to complete task

  • Is a fire extinguisher available

  • Is a first aid kit available <br>

FIELD INSPECTION

METERING

  • 1. Has the correct meter been installed at the correct address?

  • 2. Has the correct meter been installed for the installation?

  • 3. Has the meter been installed at correct level and height?

  • 4. Has metering equipment been firmly secured to the board and or structure?

  • 5. Have all tamper seals been installed on metering equipment? (Meter, links, fuses)

  • 6. Have the correct fasteners been used to secure metering equipment?

  • 7.Have terminal connections been secured firmly?

  • 8.Is the metering equipment in good working order? E.g. links, fuses, panel.

  • 9.Is the condition of the meter board / panel acceptable /enclosure acceptable <br> (does it require to be identified as a defect)<br>

  • 9A. Is the condition of the customer meter enclosure acceptable? (does it require to be identified as a customer defect)

  • 10.Has meter commissioning requirements been completed?<br>

  • 11.Has meter been checked for correct functionality, programming, type, SIR compliance etc.

  • 12.Does the metering installation comply with current SIR's?

  • 13.Has the IP rating of the meter cabinet been maintained? (When antenna installed)

  • 14. Has antenna been programmed when installed

Work Practices

Work practises

  • 15.Has Asbestos been identified and steps, procedures followed?

  • 16. Has all unused metering cables been removed or terminated?

  • 17. Has all unused metering equipment been removed?<br>(e.g. time switch)<br>

  • 18. Has non compliant meter wiring been identified as a customer defect?

  • 19. Has the work site been left tidy?

Communications

  • 20. Was the householder notified by the installer of meter exchange prior meter exchange?

  • 21. Was the customer / occupier notified of meter exchange?<br> (by mail)<br>

  • Signature: Auditor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.