Page 1: Initial questions
-
Prepared by
-
Conducted on
-
Site
-
Solarvista Job Number
-
Verisae WON
Coldrooms & Freezer Rooms
- Coldroom
-
System Number
-
Asset Number
-
Evaporator Make
-
Evaporator Model No.
-
Confirm operation of control panel isolator
-
Confirm all electrical components and cables within the control panel are free from overheating.
-
Confirm Functionality of contactors for fans and heaters are correct.
-
Isolate and Tighten all terminals in Control Panel
-
Check operation of all defrost heaters in the evaporator.
-
Check operation of all trace heaters in/on Coldroom drains
-
Check operation and direction of Evaporator fans
-
Check Evaporator Coil for ice build up and report
-
Clean Evaporator Coil Fins and Fan/Fan Guards.
Door and Floor Fabrics
- Door & Floor Fabrics
-
Confirm Room System Numbers
-
Confirm door is operation on runner or hinges
-
Confirm Door is sealing against door frame when closed (Adjust where possible)
-
Check Door seals for damage
-
Confirm operation of door trims and threshold heaters and door trims are free from ice build up
-
Confirm operation of under floor heating
-
Confirm energy doors and curtains are in place on frozen and chill room doors