Title Page
-
Job Number
-
Site Address
-
Conducted on
-
Prepared by
-
Instruction 1: Ensure media is added to each response (including photos of plans or other documents to show compliance of non-compliance if necessary).
-
Instruction 2: Satisfactory completion of all items must be noted in order for payment to be made to the designated Contractor who conducted the works.
-
Instruction 3: If there is unsatisfactory or incompleted work, note it in this report, leave the report incomplete and send the incomplete report to the Contractor that denotes the work that needs rectifying or finishing. Once the works are then successfully completed, not it in the report and complete the report
Inspection - Prior to Pour
-
The works are being completed as per the most recent Construction Plans, Structural Plans and Hydraulics (if applicable)
-
All rebates are being completed as per plans
-
All step downs are being completed as per plan
-
There is a rebate between the rain water tank slab and house slab for pest control
-
Existing Boundary Fences have been protected for the pour where slab is within 1200mm of the existing boundary fence
-
Slab and/or footing steps work to brickwork (86mm), where brickwork is shown on plan
-
All internal drainage is in place (including any external drainage that is within the slab i.e., Drainage within piers)
-
Kitchen conduit(s) is in place
-
Termite Collars installed are installed
-
The hockey stick is installed for the metre box prior to pouring
-
The steel mesh is lapped correctly 200mm minimum
-
All steel work is completed as per the Structural Plans and any Site Instruction given by the inspecting Engineer have been followed
-
Is the Moisture barrier installed below the pods (in accordance with Salinity Requirements) by at least 200mm
-
The moisture barrier is taped and sealed around penetrations
-
Any punctures in the moisture barrier have been sealed with tape
-
The moisture barrier finish at ground level on the outside of the concrete slab
-
Formboard Check completed and instructions followed with all formboards within 10mm of external dimensions of the building as shown on plan
-
Formboards are within 10mm of external dimensions of the building as shown on plan
-
Photos of Engineer's Site Instructions completed have been sent to Engineer and to Site Manager via email
-
Are all debris and offcuts removed from the slab
Other Items and/or Rectifications
-
Inspection - After to Pour
-
The slab level is within tolerances - 4mm deviation over 2 metres, 10mm of 21 deviation in any room or 20mm over the length of the building
-
The garage finish is smooth
-
The drainage has been left free from damages and not been pulled over
-
The Alfresco and Porch areas have been broomed and edged
-
The slab has been cured
-
Have the waffle pods been removed or organised to be removed from site
-
Have neighbouring boundary fences been left free of damages and concrete splash
-
The site Sediment Control Fences & Silt Socks have been left in place. All site security fences are in place correctly and the site has been left locked up and secured
-
The site and the road has been left tidy, with all rubbish left in the Bin Bay at the front of the site
Other Items and/or Rectifications
-
Inspected By
-
ANSA Representative