Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
SR Demolition Ref:
-
Premises Code:
-
HSE Licence No
-
Client Name:
-
Client Tel:
-
Client Address:
-
Client Fax:
-
Client Ref:
-
Client Contact:
-
Site Address:
Site & Enclosure Details
-
Enclosure reference (see POW)
-
Size of Enclosure? (see POW) (LXWXH (metres)
-
Has full access of the site been obtained?
-
Has a new pre filter been installed in the NPU(s)?
-
Have all ACM removal locations been checked and certified as free from asbestos?
-
Have all floor surfaces/walls/items been inspected and confirmed as visually clean?
-
Have all ledges, sills, higher level surfaces (including voids where appropriate) been inspected and confirmed as visually clean?
-
Have all cables, wiring, piping, ducting etc been checked and confirmed as visually clean?
-
Have all items or equipment brought into or remaining in the enclosure for the clearance procedure (including scaffolding and large waste items) been checked and confirmed as visually clean?
-
How long did the supervisor’s visual inspection take?
-
Supervisors visual inspection start time:
-
Supervisors visual inspection finish time:
-
Total time in hours/minutes:
-
I certify that I have carried out a thorough visual inspection of the enclosure/work area and can confirm that the area is visually clean and ready to be made available to the analyst for the independent 4-stage clearance
-
Analyst Signature:
-
Name:
-
Position:
-
Analytical Company:
-
Date:
-
Supervisor Signature:
-
Name:
-
Company:
-
Date: