Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
What is the name of contractor completing the survey?
-
What is the name of the surveyor completing the survey?
-
undefined
-
What is the building type?
-
undefined
-
What type of survey is it?
- Full refurbishment survey
- Management survey
- Refurbishment survey to specified room
-
undefined
-
Have all areas been accessed for assessment that should have been within the scope of survey?
-
Have all suspected ACMs been sampled or referenced in the survey?
-
Have all sample sites been cleaned and sealed to a suitable standard?
-
Has the survey been undertaken considerately without creating unnecessary damage?
-
Does the written survey reflect the areas and ACMs/suspected ACMS found on site?
-
Has the surveyor undertaken the survey in a methodical sequence?
-
Is there any asbestos debris present, following the survey?
-
Are there any ACM's missed off the survey?
-
Are the ACM's missed high risk or low risk?
-
Is a re-visit required by the contractor?
-
Assessment summary?
- Acceptable
- Improvement required
- Substantial improvement required
-
Add signature
-
Select date