Information

  • Document No.

  • Site Name
  • Conducted on

  • Conducted By:

  • Client / Site

  • Site Contact:

Risk Assessment Check

  • Please list below all relevant risks identified from the site visit - All areas to be assessed individually.

  • Working at Heights - NAL-022

  • Ladders - NAL- 019

  • Fixed Scaffolding

  • Hazardous Materials - COSHH Assessment

  • Slips, Trips and Falls - NAL-017

  • Pathways/ Road Access and Egress

  • Is there site security issues?

  • Any Environmental Issues?

  • Signs of Vandilism/ Social Problems

  • Storage Limitation Issues?

  • Personal Safety?

  • Vehicle Traffic issues?

  • Emissions and Processes?

  • Explosive Materials?

  • Excessive Noise Issues - NAL-012

  • Hot Works(Inside Enclosures) - NAL-031

  • Use of Power Tools?

  • Exposure to Vibration - NAL-006

  • Lone Working - NAL-010

  • Safety Harnesses & Lanyards - NAL-015

  • Use of Electric Drills - NAL-018

  • Working on fragile roofs - NAL-021

  • Cable cutting & Removal - NAL-024

  • Removal of AIB (Not ceiling tiles) - NAL-029

  • Parking Restrictions (take Photo)

  • Psittacosis - NAL-013

  • Rats or Vermin ( Leptospirosis) -NAL-008

  • Access issues on site?

  • Electric Hazards (240v) - NAL-002

  • Contractor issues?

  • Fire Hazards - NAL-026

  • Overhead power cables?

  • Plant and Machinery?

  • Manual Handling - NAL-011

  • Lighting Internal

  • Lighting External

  • Hazardous Buildings

  • Water Hazards?

  • Pressurised Gas - NAL-007

  • Storage Tanks?

  • Radiation?

  • Anthrax - NAL-001

  • Floor Voids Access/Egress - NAL-004

  • Loading Vehicles - NAL-009

  • Reversing of Vehicles - NAL-014

  • Sharps - NAL-016

  • Mobile Elevation ( Cherry pickers) NAL-020

  • Working on pitched roofs NAL-025

  • Ducting Contaminated with liquid - NAL-025

  • Removal of Asbestos Insulation - NAL-028

  • Removal of sprayed insulation - NAL-030

  • Environmental Concerns?

  • Water on Site?

  • Any Comments Relating to Risk Assessment:

Work Area Assessment

  • Location of DCU

  • Can Transit Routes be isolated from others?

  • Any third party risks associated with this project?

  • Type of Asbestos:

  • Condition of Asbestos?

  • Welfare Facilities Required?

  • Who is providing the Welfare Facilities?

  • Location of Welfare Unit?

  • Duration of Works?

  • Number of Operatives Required?

Site Environmental Management Systems.

  • E 10.1 Is the company ( or site) environmental policy available and dispatched on site, with relevant requirements highlighted at the site induction?

  • E 10.2 Has the contract and client documentation been reviewed to identify the specific environmental requirements, including planning conditions?

  • E 10.3 Has a construction environmental management plan been prepared identifying the relevant targets, objectives, issues and controls

  • E 10.4 Is there a system for ensuring that a suitable and sufficient arrangements are in place for the management, storage and disposal of waste through the production of a site waste management plan?

  • E 10.5 Is there a system for ensuring that all site personnel (including sub-contractors) are made aware of the project environmental issues and standards through site inductions, briefings and toolbox talks.

  • E 10.6 Have responsibilities for environmental management been defined and communicated through inductions, notice boards and other media?

  • E 10.7 Is someone responsible for ensuring the environmentally sensitive areas are identified and protected ( such as drainage, rivers, streams, groundwater and areas containing protected plants and animals)?

  • E 10.8 Is there a system for ensuring the necessary environmental licenses have been identified and granted ( such as discharges of water and effluent, tree preservation orders, premises producing hazardous waste and waste management licenses)?

  • E 10.9 Is there a system for ensuring that method statements include sufficient control measures for environmental management?

  • E 10.10 Is there a system for sites to deal with environmental emergencies (such as for the spill ages and groundwater contamination) and for notifying them to.

  • E 10.11 Is there a suitable and sufficient monitoring regime in place to ensure that the site environmental requirements are being met (such as relevant environmental inspections for oil and waste, protected areas, water quality, noise and dust)?

  • E 10.12 Are Environmental records being maintained (such as waste transfer notes, consignment notes and noise monitoring)?

  • E 10.13 Have adequate arrangements been established for liaison and communication with local stakeholders (residents, shops, businesses, schools, parish council)?

  • Action Point

  • Drawing of Work Area

  • Is there any site Photographs showing Risk activities?

  • Location of Photographs?

  • Have site specific Risk Assessments been completed?

  • Name of Individual completing Assessment:

  • Signature:

  • Date of Assessment:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.