Title Page
-
Job Name & number
-
Job Name and Level
-
Floor Level
-
Conducted on
-
Prepared by
-
Personnel
General Punch List Item. All questions require a responce, YES - NO - N/A
-
Is all ASC material removed from this level ?
-
Has all wood, band iron and ASC's nails been removed from the ceilings ?
-
Has all the form material been removed from inside shafts, blockouts and openings ?
-
Have all nails and anchors for securing formwork been removed and the holes repaired ?
-
Are permanant safety rails and hole covers reinstalled to original condition ?
-
Does this level have any pour backs ?
-
Have the pour backs been poured and stripped ?
-
Has this level been broom cleaned after reshore removal ? (When completed add photos.)
Walls & Column formwork
-
Are the walls visually straight and plumb ?
-
Does the form finish on walls meet a Class B (or required) finish?
-
Has the concrete slurry been removed from the top and bottom of all the walls ?
-
Does this job have sheer walls for the elevator shaft ?
-
Has the slurry between the walls and slab been removed ?
-
Have all the tie holes and flipper pockets been patched ?
-
Do the walls and slab edges inside the shaft match ?
-
Have all nessesary repairs been compleated inside the elevator shaft ?
-
Does this job have concrete walls in the stairways?
-
Has the slurry between walls and the slab been removed ?
-
Do the walls and the slab edges match?
-
Has all miss alignement in stairways been bushed and repaired ?
-
Have the tie holes, flipper pockets, honeycome, and bug holes been patched ?
-
Does this stairway meet a class B or the required finish ?
-
Has the concrete slurry been removed from the top and bottom of all columns ?
-
Does the form finish on columns meet a Class B (or required) finish?
Vertical concrete
-
Did ASC place the vertical concrete ?
-
Have honeycome and bug holes been repaired on all the columns ?
-
Have honeycome and bug holes been repaired on all the walls ?
-
Have all tie holes been patched in the walls ?
-
Is any concrete Architectual, Class A or as cast finish?
-
Does form finish meet the required finish ?
-
Does the concrete align with slab edges or other mateing surfaces as required ?
-
Has the repair been compleated ?
-
Has the repair been approved by GC and or Architect ?
Building Type
-
Is this a turnkey job?
-
Does the finish on the elevated slab meet requirments for elevation and finish ?
-
Have all the PT cables been cut off and the pockets patched ?
-
Is this level a exposed parking deck ?
-
Do the shared columns at the ramp align visualy from level to level ?
-
Have all the fins been removed from the ceilings ?
-
Is the plywood on the deck produceing an acceptablee finish ?
-
Has the concrete seepage from deck pours above been removed ?
-
Does this floor have concrete barrier walls ?
-
Have the barrier walls been poured ?
-
Have all the fins been removed and the tie holes patched ?
-
Do the walls meet the required finish ?
-
Does this level have curbs ?
-
Have the curbs been poured ?
-
Does the top and sides of the curbs meet the required finish ?
-
Does this level have barrier cables ?
-
Are all the barrier cable holes in the correct location ?
-
Have the barrier cable holes been inspected and cleaned out ?
-
Is this level a condo/hotel with exposed ceilings ?
-
Is there a drawing indicating all the exposed areas ?
-
Have the ceiling joints and imperfections been ground to +1/8" - 1/4 " in required areas ?
-
Is the plywood on the deck produceing an acceptable finish ?
-
Does this floor have exposed balconies ?
-
Have all fins and nails been removed ?
-
Has the drip strip and champher been removed from all the balconies ?
-
Has any missing or damaged drip strip or champher been repaired ?
-
Is the plywood on the balconies producing an acceptable finish ?
-
Is this an Amenities level ?
-
Does this level have curbs
-
Have the curbs been poured ?
-
Do the curbs meet the required finish ?
-
Does this level have planter and/or barrier walls
-
Have the planter wall been poured ?
-
Have the fins been removed and tie holes patched ?
-
Do the planter walls meet the required finish ?
-
Did ASC install the Imbeds ?
-
Have the nails and slurry been removed from the embeds ?
-
Is ASC responsible for the layout on the embeds ?
-
Does the embeds installation and location match approved shop drawing ?
-
Has the procedure for repair been submitted to GC and or EOR ?
-
Has the repair or repairs been compleated ?
-
Does this level have poured in place stairs ?
-
Have stairs been formed and poured ?
-
Have all the nails been removed from the stair bed and embeds ?
-
Have the treads and risers been measured for required tolerance ?
-
Do the stairs have required clearance on all sides ? (includind headroom and landings)
-
Has this floor been inspected and signed off by the GC ?
-
Signed of By :
-
Add Comments
-