Information

  • JOB NAME AND NO.

  • Level and pour number

  • Company name;

  • Conducted on

  • Prepared by

  • Location
  • Personnel accompanying inspection;

Drawings

  • Do you have a sealed drawing on site for this pour ?

TABLES

  • Are all legs dropped and pined?

  • Are all screws snug?<br>

  • Are all truss braces in place and bolts snug?

  • Is all X bracing in place?

  • Are all additional shores in place (if required) secured from tipping and plumb ?

  • Do all Steel Shores have pin fully inserted or Ellis shores have two nails?

  • Is all lacing in place (if required)?

RESHORES

  • Are all reshores in place (leg to leg) plumb with spring clips ?

  • Are all pins completely inserted and are all reshores snug to ceiling ?

  • Have reshores on lower levels been rechecked ?

  • Are all reshores at perimeter of building secured to prevent tipping?

  • Are all floors supporting formwork up to strength?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.