Information
-
Elecomm Project Code:
-
Store Name:
-
Store Number:
-
Date:
-
Start Time:
-
End Time:
-
List services that are affected?
-
How many existing AP's?
-
Which areas?
-
New cabinet size required?
-
Wall mounted or floor mounted cabinet required?
-
How many CAT5e cables to be re-terminated?
-
Any re-cables required?
-
Approx length of any required re-cables?
-
Fibre type?
-
Additional fibre required?
-
Approx additional fibre length?
-
Re-splice required?
-
Make a sketch of the area and attach a photo of the sketch. Include any relevant photo's of the area.
-
Any new/additional CAT5e cables required?
-
Approx length of any additional CAT5e cables?
-
Any additional containment required? If yes list requirement
-
New UPS to be fitted?
-
Is power available?
-
Is new power required?
-
Outage time, nights or days?
-
Estimated time?
-
Is a lifter required? If yes list which type
-
COMMENTS:
SITE SIGN-OFF: The above work has taken place and the site has been left in an acceptable condition.
-
Signed (Elecomm Engineer)
-
Signed (Store Representative)