Information
-
Store Number:
-
Store Name:
-
Conducted on
Ad-Hoc Works Sign Off
Installation Details
-
Store Number:
-
Store Name:
-
Activity Date:
-
Engineer Name:
-
Have RAMs been read and signed?
-
If 'No' provide details
-
Purpose of Visit
(Please enter details of fault below) -
Fault 1
-
Fault 2
-
Fault 3
-
Fault 4
-
Fault 5
-
Has fault 1 been repaired successfully? Please provide details on what was done to fix.
-
If 'No' provide details
-
If 'yes' provide details on what was done in order to fix
-
Please insert photo of test result for Fault 1
-
Has Fault 2 been repaired successfully?
-
If 'No' provide details
-
If 'yes' provide details on what was done in order to fix
-
Please insert photo of test result for Fault 2
-
Has fault 3 been repaired successfully?
-
If 'No' provide details
-
If 'yes' provide details on what was done in order to fix
-
Please insert photo of test result for Fault 3
-
Has fault 4 been repaired successfully?
-
If 'No' provide details
-
If 'yes' provide details on what was done in order to fix
-
Please insert photo of test result for Fault 4
-
Has fault 5 been repaired successfully?
-
If 'No' provide details
-
If 'yes' provide details on what was done in order to fix
-
Please insert photo of test result for Fault 5
-
If any faults require a revisit, or re-cabling, please provide details of what is required? i.e what lifter is required? What is the length of the cable? does this need to be OOH?
-
Engineer comments:
Supporting Photo's
Photos
-
Please provide supporting photo's for the work that you have carried out
-
Supporting Photo's
Customer Sign Off
Customer Sign Off
-
Please note that this should be completed by the Duty/Delivery Manager - the purpose of this form is to verify that the works performed by the engineer is as per the 'Purpose of the Visit'.
-
Time Onsite
-
Time Off site
-
Engineers Sign Off:
-
Customer Sign Off: