Information
Asset Information
-
Audit Title
-
Client / Site
-
Job Number
-
Site Number
-
Location
-
Asset No:
-
Carried out on
-
PMI Engineer
Asset Information
-
System Type
-
Control Type
Cameras
-
Number of Cameras checked?
-
General Condition
-
General Quality of Live Images
-
Cabling/Connection Condition
-
Condition of External Housings
-
Brackets & Mounts Condition
-
Dedicated Lighting Installed
-
- IR Lamps
- IR LEDS
- Integrated IR
- White LED Light
-
Lighting Condition
-
Labels Installed?
-
Cameras Cleaned?
Camera Further Actions
-
Any Camera Further Actions Required?
-
Identified FAR's
Camera FAR
-
Risk Level
-
Action Level
- Urgent Action Required
- Client Action Required
- ASG Action Required
- Advisory Only
-
Description
-
Add media
Recording Suites
-
Recording Suites
Record Suite
-
Add media
-
Suite Type
-
If other then describe
-
Suite Location
-
General Condition
-
Cabling/Connection Condition
-
Label Installed
-
Ventilation
-
UPS Installed?
-
Is System Networked
-
IP Address
-
SUB Net Mask
-
Port
Menu Access
-
User Code Available/Set?
-
Engineer Code Updated/Set
Recording
-
Test Daytime Recorded Image Quality?
-
Test NightTime Recorded Image Quality?
-
Offload Sample Video
-
Earliest Recording Available
Recording Settings
-
Quality Settings
-
Frame Rate
-
IPS Settings
-
Image/Media
Recording Suite Further Actions
-
Any Further Actions Required?
-
Identified FAR's
Recording Suite FAR
-
Risk Level
-
Action Level
- Urgent Action Required
- Client Action Required
- ASG Action Required
- Advisory Only
-
Description
-
Add media
Alarms and Video Motion
-
Does the system have Alarm/VMD inputs
-
Does System Have Alarm Inputs
-
Alarm Input Type
- PIR
- Contact
- Beams
- Other
-
Other Type
-
Input(s) Item Physical Condition
-
Are inputs working and fit for purpose?
-
Check DVR Settings are ok?
-
Is Video Motion Detection Activated?
-
Check VMD settings?
-
Check VMD actions?
-
Add media
Alarm Further Actions
-
Any Further Actions Required?
-
Identified FAR's
Alarm & VMD FAR
-
Risk Level
-
Action Level
- Urgent Action Required
- Client Action Required
- ASG Action Required
- Advisory Only
-
Description
-
Add media
Monitors & Keyboards
Monitors
-
Monitors Installed?
Monitor
-
Location
-
Quality Of Image?
-
Cable/Connection Condition?
-
Monitor Cleaned?
-
Monitor Label Installed?
-
Add media
Keyboards
-
Keyboards Installed?
Keyboard
-
Location
-
Condition?
-
Function?
-
Cable/Connection Condition?
-
Cleaned?
-
Label Installed?
-
Add media
Monitor/Keyboard Further Actions
-
Any Further Actions Required?
-
Monitor & Keyboard FAR?
Monitor FAR
-
Risk Level
-
Action Level
- Urgent Action Required
- Client Action Required
- ASG Action Required
- Advisory Only
-
Description
-
Add media
Other Recommendations
-
Any Further Recommendations?
-
Additional Recommendation
Recommendation
-
Additional Recommendations
-
Add media
General
System General
-
CCTV Signs Installed?
-
Control Suite PMI Labels Installed?
-
CCTV Log Book Installed and Updated (where applicable)?
Client Familiarity
-
Is Client Familiar System General Operation?
-
Is Client Familiar System Software?
-
Is Client Familiar System Replay and Offload?
-
Is Additional Staff Training Required?
Summary PMI Outcome
PMI Outcome
-
Based on the above assessment we consider this CCTV system to have:
-
Congratulations your system has PASSED its basic visual PMI checks, and is considered at his time to be safe to operate.
Please ensure though you carry our regular visual checks and ensure any actions needed are reported immediately to us. -
Your system is considered to have passed the basics visual checks, however we have identified additional further actions that are required. Additional remedial works will be provided to you in a separate report along with associated costs.
-
Your system is considered to have FAILED it's visual PMI checks on a number of serious items. The remedial actions will be provided to you in a separate report along with associated costs.
In the meantime you may wish to consider placing the system or devices "out of action"until these remedial works are completed! -
Your system has been CONDEMNED which indicates that we have found significant failures and consider a danger for continued use.
We strongly advise the system or condemned component be placed "out of action" until such time as remedial or replacement works can be carried out.
-
Engineer signature