Information

Asset Information

  • Client / Site

  • Asset Name

  • Asset No:

  • Location
  • Conducted on

  • Prepared by

Asset Information

Asset Information

  • Make

  • Other

  • Model

  • Voltage

  • Control Board

  • Gate Type

  • Other

  • Gate Size (m)

  • Gate Use

  • Other

  • Operator Type

  • Other

  • Run Type

  • If OTHER then detail

  • Construction

  • If OTHER then detail

  • Electronic lock system installed?

  • If OTHER then detail

  • Maintenance Label Installed?

  • Is CE label installed

  • Photos

Control Devices

Entry Devices

  • Entry Devices Installed?

  • If OTHER then detail

  • Entry Devices Condition

  • Entry Devices Working

Exit Devices

  • Exit Devices Installed?

  • If OTHER then detail

  • Exit Devices Condition

  • Exit Devices Working

General Checks

General Condition

  • Condition?

  • Base/Foundation Condition?

  • Operator/Drive Condition?

  • Mechanical Function & Operation?

  • Visual Track Check

  • Smoothness of Operation?

  • Cables connection and loops condition?

  • Podium Condition?

  • Road Markings Suitable?

Power

Control Box

  • Lockable?

  • Condition?

  • Client Access?

Electrics

  • Individual Spurs?

  • Correctly Fused?

  • Ext Power Shutoff available?

  • Labelled?

  • Power Down Test carried out?

  • Power down test result?

Batteries

  • Is battery support installed?

  • Battery Condition?

  • Battery Require Replacement?

  • Add media

Fire Alarm

  • Fire alarm relays installed?

  • It is not clear to us whether a fire interface has been installed for this system. We therefore advise the client to check this with their appointed fire advisor, and check during regular fire alarm test as to whether this system responds in a suitable way. Fire alarm interfacing and programming can be retrospectively carried out. Further information available on request.

  • Has it been tested?

  • CLIENT IS ADVISED TO CHECK SYSTEM FUNCTION DURING WEEKLY
    FIRE ALARM TEST OR AT EARLIEST OPPORTUNITY.

Safety Devices

Safety

  • Pedestrian Access

  • Separate Pedestrian Walkway?

  • Suitable Pedestrian Seperation?

  • Warning Signs Installed?

  • Safety Devices Installed?

  • Safety Edge Detection

  • Safety Beams

  • Safety Loop(s)?

  • Safety Other

Client

Client

  • Is System Manual Available?

  • Is Manual to Standard?

  • Has PMI Log been checked?

  • Is Client aware of how to use system?

  • Is Gate Override easily accessible?

  • Is Client aware of gate override?

  • Is further training required?

FAR

  • Are there any Further Actions Required

  • FAR
  • Type

  • Risk Level

  • Action Level

  • Description

  • Add media

Recommendations

  • Additional Recommendation

  • Recommendation
  • Risk Level

  • Additional Recommendations

Certification

Certificaton

  • Is impact Test required?

  • Has Impact Certification Test been Carried Out

  • ICL Test Result

  • Your System has FAILED its Calibrated Impact Testing Certification.

    This could be for a number of reasons, which will be highlighted in the Further Action Required Section of this report.

    We would STRONGLY recommend you DO NOT continue to use the system until such time as the remedial works have been completed and the system is issued with a pass certificate.

  • Your System has PASSED its Calibrated Impact Testing Certification.
    A certificate and results will be provided to you along with this report for your safe keeping.

  • Reason not carried out?

Summary PMI Outcome

PMI Outcome

  • Based on the above assessment we consider this system to have:

  • Congratulations your system has PASSED its basic visual PMI checks, and is considered at this time to be safe to operate.
    Please ensure though you carry our regular visual checks and ensure any actions needed are reported immediately to us.

  • Your system is considered to have passed the basics visual checks, however we have identified additional further actions that are required to make the doors function fully or to meet the latest Standards to which they should have been installed. Additional remedial works will be provided to you in a separate report along with associated costs.

  • Your system is considered to have FAILED it's visual PMI checks on a number of serious items and in our opinion is unlikely to comply with current standards until these remedial actions are taken to ensure the system is safe for use. The remedial actions will be provided to you in a separate report along with associated costs.

    In the meantime you may wish to consider placing the system "out of action" until these remedial works are completed!

  • Your system has been CONDEMNED which indicates that we have found significant failures in either the structure which could lead to injury, or failures in system operation that render the system unsafe for continued use.

    We strongly advise the system be placed "out of action" until such time as remedial or replacement works can be carried out.

  • Engineer signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.