Title Page
-
Site conducted
-
Principal Contractor
-
Date
-
Manager
-
H&S Auditor
-
Site Address
-
Description of Activities
Site specifics
-
Hoarding and gates in good condition, secure with sufficient signage?
-
Boundary foot-ways and roads free from hazards?
-
Public are protected from falling material?
-
Pedestrian segregated routes available to office, welfare, and work areas?
-
Is the site free of trip hazards?
-
Good housekeeping maintained?
-
Signing in book used (in & out)?
-
H&S law poster on display?
-
Construction phase (H, S and E) Plan and F10 in a prominent position?
-
Traffic management plan in place & applied?
-
A&E map on display?
-
Fire plan?
-
Relevant permits (Hot, Dig, Wah, Entry) issued for works & date?
-
First aid kit, First Aider, accident book?
-
Other
Specifics
-
Induction records and CSCS card copies on file?
-
Training / competency up to date?
-
RAMS signed and current / specific?
-
Foreign workers – RAMS understood? (Translator / supervision / buddy)
-
Working to RAMS?
-
Other
Plant / Vehicle Safety
-
Unloading vehicles in a safe manner / environment?
-
Banksman competency?
-
CPCS / NPORS / IPAF Competency certificates in date?
-
Operator regular inspections completed and up to date?
-
Does Plant appear in good condition?
-
Damage reported to Head office?
-
Safe use & operation observed?
-
Other
Friday packs up to date
-
Tool box talks completed?
-
PUWER
-
LOLER
-
HAVS assessment completed?
-
Statutory inspections (WaH, Excavations, etc)?
-
Other
Lifting Safety
-
Is a Lifting plan in place?
-
LOLER - thorough examination for plant available?
-
LOLER – lifting accessories tested and tagged?
-
Operator lifting competency?
-
Are measures in place to prevent contact with overhead power lines including Delivery vehicle HIAB’s
-
Other
Temporary Works
-
Is there a temporary works register?
-
Are Temporary works safe?
Welfare Facilities : Canteen
-
Fridge and kettles
-
Clean and suitable
-
Microwave
-
Hot & cold water
-
Drinking water and drinking vessels
-
Drying Room
-
Heaters
-
Benches & lockers
-
Toilets - Clean, sufficient and large enough
-
Other
Electrical Safety
-
110v or battery powered work equipment used?
-
PAT test labels clearly visible on tools and equipment or is there other evidence of such tests available on site?
-
If 240v are RCD’s fitted?
-
Lighting / task lighting?
-
Other
Fire Precaution
-
Fire Assembly (muster) point?
-
Fire escape signs?
-
Clear routes and fire doors?
-
No smoking and smoking area?
-
Fire points and alarms?
-
Fire drill recorded?
-
Other
COSHH Storage
-
COSHH store & fire extinguishers?
-
COSHH register?
-
COSHH assessments & MSDS available?
-
Emergency spill kits, plant nappies, drip trays?
-
Are those working with or effected by controlled substances wearing suitable PPE?
-
Are those not working with products protected from the risk?
-
Gas storage / Safety?
-
Other?
-
Ladders, Steps, & Podiums
-
7 day statutory inspections completed?
-
Are they the correct grade (industrial) and suitable for the work?
-
Used at correct angle and secured (ladders)?
-
Podiums, are gates closed and wheels locked when in use?
Mobile Towers
-
7 day statutory inspections completed?
-
Erected to manufacturer’s instructions by a competent person?
-
Access correct via internal ladders?
-
Are wheels locked when tower is in use?
-
Are towers used on suitable ground with outriggers if required?
Scaffolding (tube and fitting)
-
Design / compliance sheets available?
-
Hand over certificate & tie pull tests available?
-
7 day statutory inspections completed?
-
Gin wheel / lifting equipment certification?
-
Suitable access ladders, gated access points, clear ‘landing areas’?
-
Base plates, sole boards, and standard spacings?
-
‘Scaff-tag’ in use / signed to prevent use of incomplete scaffold?
-
Internal boards clipped to prevent movement?
-
Platforms fully boarded, wide enough for purpose and free from tripping hazards with materials stored safely?
-
Physical barriers,/ guards in place to prevent falls of persons or materials i.e. gaps of no more than 470mm and a hand rail at 950mm as minimum requirements with brick guards in use where required?
-
SWL’s clearly indicated on loading bays?
-
Adequately secured to structure with sufficient ties
-
Façade bracing every 6 bays and ledger bracing alternatively braced to standards?
-
Are Toe Boards in place and secured, to a minimum of 150mm?
-
Are adequate fall prevention controls in place during erection?
Falls from height
-
Lift shafts and leading edges protected?
-
Fragile floors & holes protected?
-
Other
MEWPS
-
Used correctly by trained operatives?
-
Thorough examination available?
-
Operatives stood inside the protected platform?
-
Physical barrier (exclusion zone) set up around the work area?
-
Are ground-conditions suitable for use?
-
Being used in suitable weather conditions?
-
Warning sounders and beacons in use?
-
Other
Excavations
-
Utility plans available on site, in date and legible?
-
Area has been (CAT) scanned and findings have been marked up?
-
Cable avoidance tool in good working order, within calibration date and used by a competent person?
-
Calibration Certificate available?
-
All exposed utilities supported and protected?
-
Excavations supported in accordance with HSG185 (safety in excavations)?
-
Excavation earthwork support designs in place (Temporary Works) or Battered / stepped sides?
-
Excavation inspections are complete?
-
Adequate warning and protection of overhead & Underground services ?
-
All excavation arisings are positioned safely?
-
Manual handling techniques are adopted?
-
Plant is operating in a managed working area?
-
A ‘watch and brief’ operative is required in machine attendance?
-
All confined space operations that are being carried out, are being controlled?
-
Other
Noise & Dust Management
-
General site dust control in place?
-
Dust control from cutting/ sawing?
-
Has an exclusion zone been set up for cutting / noise?
-
Is noise reduction equipment is in place to prevent uncontrolled spread of noise?
-
Is correct PPE &/or RPE being used?
-
Other
PPE (General site appearance)
-
Hard hats
-
High viz
-
Safety footwear?
-
Gloves
-
Ear defenders
-
Eye protection
-
Respiratory protective equipment & Face fit tested
-
Harness / FPE
-
Is the correct type of PPE available and worn where required?
-
Other
Material and Equipment Storage
-
Materials stored / stacked in a safe manner?
-
Plant / equipment?
-
Bucket changing area?
-
Other
Asbestos Management
-
Is an Asbestos Register / R & D survey available on site?
-
Are Operatives required to work in areas with known asbestos present?
-
Are Operatives Asbestos awareness trained?
-
Is asbestos labelled / signs in position / barriered off to identify its location within the vicinity of the works?
NOTES:
-
NOTES: