Information

  • Audit Title

  • OPS FacID

  • Facility Name

  • Conducted on

  • Location
  • # of Tanks Inspected

  • Tank IDs

  • Prepared by

  • Inspector Information

Primary Tank and Piping

  • Is tank exterior (roof, shell, ends, connections, fittings, valves, etc.) free of visible leaks?

  • Comments/Date Corrected

  • Is aboveground piping (roof, shell, ends, connections, fittings, valves, etc.) free of visible leaks?

  • Comments/Date Corrected

  • Are ladders/platforms/walkways secure with no sign of severe corrosion or damage?

  • Comments/Date Corrected

  • Are all tank openings properly sealed (capped, plugged, covered, blind flanged, etc.)?

  • Comments/Date Corrected

  • Is the tank liquid level gauge readable and in good working condition?

  • Comments/Date Corrected

  • Is overfill prevention equipment in good working condition (overfill valve, audible alarm, etc.)?

  • Comments/Date Corrected

  • Is the spill container (spill bucket) empty, free of visible leaks, and in good working condition?

  • Comments/Date Corrected

  • Is the primary tank free of water?

  • Comments/Date Corrected

  • Is the area around the tank (concrete surfaces, ground, containment, etc.) free of visible signs of leakage?

  • Comments/Date Corrected

  • Cathodic protection system in operating condition and functional? - (Inspection required every 60 days only).

  • Comments/Date Corrected

  • Rectifier reading: Volts and Amps. - (Inspection required every 60 days only).

  • Comments/Date Corrected

Double-wall Tank

  • For double-wall tanks, is interstice free of liquid?

  • Comments/Date Corrected

  • For double-wall tanks, is interstitial monitoring equipment in good working condition?

  • Comments/Date Corrected

Containment (Diking/Impounding)

  • Is the containment free of liquids, debris, combustible materials, and empty or full drums/barrels?

  • Comments/Date Corrected

  • Are dike drain valves closed and in good working condition?

  • Comments/Date Corrected

  • Are containment egress pathways clear and any gates/doors operable?

  • Comments/Date Corrected

Other Conditions

  • Are there other conditions needing to be addressed for continued safe operation or that may affect the site SPCC Plan?

  • Comments/Date Corrected

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.