Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Audit/Inspection

  • CR.3-Application for Construction Work Permit

  • CR.4-Notification of Construction Work

  • EIR.4-COC Issued for Elec. Installation on Site

  • NBR-Emergency Contact Details

  • CR.5(1)(b)-Client Health & Safety Specifications

  • COID Act-Letter of Good Standing

  • SEC.9-Public liability

  • SEC.7(1)-Policies

  • CR.7(1)(a)-SHE Plan

  • CR.10-Fall Protection Plan

  • CR.10-Working at Heights Certificates (If Applicable)

  • 37.2 Mandatory Agreement

  • PC Appointment Letter

  • SUBC Appointment Letter

  • SEC.8-Organogram

  • Appointment: 16.1 CEO

  • Appointment: 16.2 Delegated Manager

  • Appointment: CR.8(1)-Construction Manager

  • Appointment: CR.8(2)-Assistant Construction Manager

  • Appointment: CR.8(7)-Construction Works Supervisor

  • Appointment: CR.8(8)-Subordinate Construction Works Supervisor

  • Appointment: CR.8(5)-Construction Safety Officer (POC)

  • Appointment: CR.9(1)-Risk Assessor (POC)

  • Appointment: CR.10(1)(a)-Fall Protection Planner (POC)

  • Appointment: GAR.9-Incident Investigator (POC)

  • Appointment: CR.29-Emergency Evacuation Coordinator

  • Appointment: CR.29-Fire Equipment Inspector (POC)

  • Appointment: GSR.3-First Aider (POC)

  • Appointment: SEC.8-Hand Tools Inspector

  • Appointment: GSR.2-PPE Supervisor

  • Appointment: ERM.10-Portable Power Tools Inspector

  • Appointment: CR.27-Housekeeping Supervisor

  • Appointment: CR.28-Stacking/Storage Supervisor

  • Appointment: DMR.6(16)-Compliance Officer

  • Appointment: SEC.17 & 18-Health & Safety Representative (POC)

  • Appointment: SEC.19 & 20-OHS Committee Member

  • Appointment: CR10(2)(d)-Safety Harness Inspector

  • Appointment: GSR.13(a)-Portable Ladders Inspector

  • Appointment: CR.23-Construction Vehicle/Mobile Plant Operator/Inspector & Supervisor

  • Appointment: EWR-Environmental Officer

  • Appointment: HCSR-Supervisor/Controller

  • Appointment: Hygiene Inspector

  • Appointment: CR.13-Excavation Inspector/Supervisor

  • Appointment: CR.16-Scaffolding Erector (POC)

  • Appointment: CR.16-Scaffolding Inspector/Supervisor (POC)

  • Appointment: EMR.9 & 10-Temporary Electrical Installation Inspector (POC)

  • Appointment: EMR.9 & 10-Electrical Installation Electrician (POC)

  • Appointment: EMR.9 & 10-Master Electrician for Electrical Installations (POC)

  • Appointment: CR.12(2)-Temporary Works Supervisor

  • Appointment: CR.14-Demolition Supervisor (POC)

  • Appointment: CR.17(1)-Suspended Platform Supervisor

  • Appointment: CR.19-Material Hoist Operator/Inspector (POC)

  • Appointment: DMR.18-Lifting Machine Operator/Inspector

  • Appointment: DMR.18-Banksman/Rigger (POC)

  • Appointment: GMR.4-Concrete Mixer Operator/Inspector

  • Appointment: CR.22-Crane Operator (POC)

  • Appointment: CR.18(1)(a)-Rope Access Supervisor (POC)

  • Appointment: CR.18(1)(a)-Rope Access Equipment Inspector (POC)

  • Appointment: CR.21(2)(b) & 2(g)(i)-Explosive Actuated Fastening Device Controller/Supervisor (POC)

  • Appointment: PER.13-Preasure Equipment Supervisor (POC)

  • Appointment: GSR.9-Welding, Flame Cutting Inspector/Supervisor (POC)

  • SEC.37(2)-Mandatory Agreement

  • CR.5(1)(k)-Principal Contractor Appointment

  • CR.7(1)(c)(iv)-Sub Contractor Appointment

  • GAR.5-Osh Act

  • GAR.5-Construction Regulations

  • EIR-Electrical Installation Regulations

  • CR.9-Risk Assessment Review & Monitoring Plan

  • CR.9-Approved Baseline RA

  • CR.9-Task Specific Risk Assessments

  • CR.9-Safe Work Procedures for Risk Assessments

  • GSR.3-Minor Injury Dressing Register

  • GSR.3-First Aid Box Equipment Register/Checklist

  • GSR.13(a)-Portable Ladders Register/Checklist

  • EMR.10-Portable Power Tools Register/Checklist

  • CR.29-Fire Equipment Register/Checklist

  • GSR.2-Personal Protective Equipment Register/Checklist

  • SEC.8-Hand Tools Register/Checklist

  • CR.27-Housekeeping Register/Checklist

  • CR.28-Stacking/Storage Register/Checklist

  • CR.23-Construction Vehicle Register/Checklist

  • CR.23-Mobile Plant Register/Checklist

  • Monthly Hygiene Register/Checklist

  • CR.10-Safety Harness Register/Checklist

  • CR.16-Scaffolding Register/Checklist

  • CR.13-Excavations Register/Checklist

  • CR.12-Temporary Works/Formwork Register/Checklist

  • CR.24(d)-Temporary Electrical Installation Register/Checklist

  • SABS 0142-1: Earth Leakage Test Register/Checklist

  • GSR.9-Welding Machine Register/Checklist

  • SEC.17-Monthly SHE Rep Report

  • DMR.18-Lifting Tackle (slings, ropes & chains) Register/checklist

  • CR.21-Explosive Actuated Fastening Device Register/Checklist

  • PER.13-Pneumatic Tools Register/Checklist

  • Pere.13-Pressure Equipment Register/Checklist

  • NEMA-Waste Disposal Register

  • COVID-19: Screening Register

  • GMR.4-Concrete Mixer Register/Checklist

  • CR.14-Demolition Register/Checklist

  • GAR.9-Incident Investigating Procedure (annexure 1)

  • SEC.24-Reporting of incidents to dept. of Labour

  • SEC.24-Reporting of Dreaded Disease to Dept. of Labour

  • ERW-Emergency Evacuation Procedures

  • CR.29-Basic Fire Fighting Training

  • SEC.13(a)-Induction Training for Employees

  • NBR-Updated List of Employees on Site

  • CR.9-Toolbox Talk Manual Available

  • CR.9-Toolbox Talks

  • Planned Task Observation (PTO's)

  • Daily Safety Task Instructions (DSTI's)

  • HCSR-MSDS's Available

  • SEC.13-Certified ID Copies of Employees on Site

  • CR..7(g)-Medical Certificates of Employees on Site

  • CR.7(g)-Annexure 3 Certificates of Employees on Site

  • SEC.13(a)-Company Site Rules

  • EMR-Electrical /Mechanical Lock Out Procedures

  • NEMA-Environmental/Waste Management Plan

  • COVID-19: Policies, Procedures & Risk Assessment

  • ERW.3-Lighting Conditions Adequate

  • GSR.2(c)-Access Control

  • GSR.3-First Aid box Available on Site (more than 5 employees)

  • GSR.3-First Aid Box Equip as per OSH Act

  • GSR.3-First Aid Box Location Indicated

  • GSR.3-First Aid Agreement

  • CR.13-Excavations shored

  • CR.13- Barricading Placed Around Excavations

  • CR.13-Access & Egress Exit for Employees

  • CR.13-Warning Signs Displayed at Excavations

  • CR.13-Ladders Every 6m in Excavations

  • CR.30-Ablution Facilities on Site

  • CR.30-Hand Wash Facilities on Site

  • ERW-Dust Control in Place

  • CR.16-Scaffolding Foundation Stable

  • CR.16-Adequate Bracing

  • CR.16-Scaffolding Platform Boards in Good Condition

  • CR.16-Scaffolding Adequate Hand Rails

  • CR.16-Scaffolding Toe Boards Provided

  • CR.16-Scaffolding Access Ladders/Stairs Provided

  • CR.16-Safe/Unsafe Signs Displayed

  • Construction Site Notice Signs Displayed

  • Site Photos

  • Site Photos

  • Site Photos

  • Site Photos

  • Site Photos

  • Site Photos

  • Site Photos

  • Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.