Title Page
-
Site conducted
-
Site Name
-
Route
- LNE~Eastern
- LNW
- Western
- Wessex
- Scotland
- Wales
- Kent
-
JT Number
-
Conducted on
-
Prepared by
-
Auditor Signature
-
Location
-
Gang Leader / Operatives on site
-
Nature Of Site Works
General Documentation
-
Task Brief & WPP/CPP available on site?
-
Task Brief/WPP/CPP in date?
-
Pre-start checks available on site?
-
Underground services CAT scanned and plans on site?
-
SSOWP applicable to this site?
-
Have the team filled out all relevant paperwork for the site?
Personal Protective Equipment (PPE)
-
PPE Spot Check
- Hard Hat
- Glasses / Goggles
- Gloves
- Logo Vest/jacket
- Boots
- Ear Defenders
- Respiratory Mask
-
Hi-Vis clothing in good order and all present?
General Site Safety
-
Welfare Facilities meet NR standards?
-
Fire Extinguishers available on site?
-
Sufficient lighting?
-
Site Tidiness?
-
Appropriate Ground conditions?
-
Fuel Storage labelled and bunded?
Fencing Safety
-
Plant being used on site?
- 1.5t - 3t Excavator
- Tracked Dumper
- Tracked Barrow
- Tracked Chipper
- Hydraulic Breaker
- Other
-
Plant operatives certification available?
-
Small tools in good condition?
-
Insulated tools applicable and on site?
-
Safe manual handling of materials?
-
Access and egress to works area is Safe?
Workers on site
-
Did the team leader brief you on the worksite?
-
PTS Cards on site?
-
Are the team working safely?
-
Operatives undertaking the tasks they are trained to do?
-
Is a Whiteboard present on site and filled in?
Works Affecting the Public
-
Falling materials risk?
-
Are noise levels acceptable?
-
Are dust and fumes levels acceptable ?
-
Road traffic management utilised if required?
-
Public segregated from working areas?
Environmental Management
-
Observation for nesting birds been undertaken?
-
Ecology report available on site, if applicable?
-
Fuel/chemical spill kits on site?
-
Is the site area clear of spillage and other pollution ?
-
Is the site clear of asbestos?
Quality
-
Are the team suitable to the job they are undertaking?
-
Quality of fencing/veg undertaken acceptable?
-
Quantity (volume) of fencing/veg being installed acceptable?
Photos
-
Relevent site photos