Title Page
-
Audit Title
-
Jobsite Name
-
Location
-
Select date
-
Superintendent
-
Audit Conducted By
PROGRAM ADMINISTRATION
-
OSHA Postings
-
Emergency numbers / contacts posted
-
Emergency action plan up to date
-
Company safety manual
-
Toolbox talks
-
First aid kit
BARRICADES AND FENCING
-
Roadways and sidewalks protected
-
Floor openings planked or barricaded
-
Wall, roof openings covered or barricaded
-
Leading edges guarded
-
Traffic controls utilized for roadwork
ELECTRICAL / UTILITY
-
Insulation intact on cords and wiring
-
Temporary lighting guarded
-
Electrical panels labeled HOT and covered
-
GFCI protection utilized
-
Underground electrical lines marked
-
Underground gas lined marked
-
Lockout procedures utilized
ENVIRONMENTAL CONTROLS
-
Silt fence installed and maintained
-
Hazardous materials properly stored
EQUIPMENT
-
Brakes, lights, signals, and alarms operative
-
Seat belts worn
-
Aerial lift - PPE being used
-
Rigging equipment inspected - tag showing
FALL PROTECTION
-
Are employees protected from falls when working at heights > 6'
-
Is fall protection equipment in safe working condition (PFAS, guardrails, warning lines, etc.)
FIRE PREVENTION
-
Are safety cans being used and properly labeled
-
Propane tanks & fuel tanks: barricade installed, fire extinguisher (20-B), labeled (flammable, no smoking, fuel type)
-
Compressed gas cylinders secured, upright, protected from damage
-
Flashback arrestors utilized with cutting torch and/or gas cylinders
-
Fire extinguishers immediately available and inspection current
HAND AND POWER TOOLS
-
Hand tools in good working order
-
Electrical cords in good working order
-
All mechaincal guards in use
-
Handles not broken/splinter free
HOUSEKEEPING
-
Work areas orderly
-
Adequate lighting
-
Job site free of slips, trips and fall hazards
-
Stairways / walkways clear
-
Trash picked up
LADDERS
-
Ladders in good condition
-
Side rails extend 36' above landing
-
Proper for job and secured
-
Step ladders fully open when in use
-
Placement of ladder safe, including 4:1 ratio
PPE
-
Hard hats worn
-
Gloves available
-
Faceshield is being used - mason saw or other operations
-
Eye protection
-
Hearing protection
-
Safety harness and lanyards utilized with adequate anchor points
-
Respirators or masks utilized
-
High visible clothing in use
Company Notes
-
#1 Other
-
#2 Other
-
Inspection Reviewed With
-
Audit Completion
-
Add media