Title Page
-
Document No.
-
Audit Title
-
Conducted on
-
Employee being assessed
Add Employee
-
Client name
-
Service Number
-
WorkCover Lic. No.
-
Depot
-
Location
Driving Audit
-
Vehicle driving Audit
Add Vehicle
Vehicle Information
-
Vehicle type
-
Rego number
-
Plant number
Pre-operation
-
Vehicle pre-operational inspections and checks were performed
-
Operator manages actions to be taken for any vehicle defects
-
General house keeping in vehicle
-
Correct use of RMS work diary
-
Pre-operations additional comments
Fatigue related questions
-
Legal driving limit in 24 hours time span for heavy vehicles - (12hrs)
-
Legal driving limit in 7 days time span for heavy vehicles - (72hrs)
-
Rest breaks must be taken at what intervals during your working day - (5.15hrs, 7.3hrs, 10hrs)
-
Fatigue additional comments
Loading
-
Load restraint equipment inspected prior to use
-
The vehicle is loaded as per weight and dimension by RMS regulation
-
Loading additional notes
Driving Ability
-
The vehicle is started, steered, manoeuvred, positioned and stopped in a safe manner
-
Engine power in managed to ensure efficiency and performance to minimise engine and gear damage
-
Driving hazards are identified and/or anticipated
-
Braking system of vehicle is managed and operated to ensure effective control of the vehicle under all conditions
-
The vehicle is driven in reverse, maintaining visibility to achieve accurate positioning (using an observer)
-
Traffic and rad conditions are constantly monitored and acted upon to enable safe operations
-
Driver behaviour in the vehicle operation
-
The vehicle is parked, shut down and secured in accordance with manufactures specification
-
Driving ability additional notes
Crane Audit
-
Crane Audit
Add crane audit
Crane Information
-
Crane type
-
Plant Number
Pre Operational Checks
-
Conduct Routine plant post-operations inspection of vehicle as per manufactures instructions
-
Operator manages actions to be taken for any defective equipment has been identified
-
General house keeping in good order
-
Additional Notes
Job completion
-
Stabilisers stowed in accordance with manufactures instructions
-
Crane stowed in accordance with manufactures instructions
-
Worksite left in accordance with Endeavour energy's Procedures
EWP Audit
-
EWP Audit
Add EWP
EWP Information
-
EWP type
-
Plant Number
Pre Operational Checks
-
Conduct Routine plant post-operations inspection of vehicle as per manufactures instructions
-
Operator manages actions to be taken for any defective equipment has been identified
-
General house keeping in good order
-
Additional Notes
Site Setup
-
Vehicle parked safely according to task to be performed
-
Hand break applied correctly in accordance with manufactures instruction
-
Conduct WHRA and plan work
-
Take photo of Risk Assessment
-
Additional notes
Operational
-
Engage PTO in accordance with manufactures instruction
-
Identify SWL load of EWP
-
Secure stabilisation of EWP in accordance with manufactures instructions
-
Occupants of EWP basket attached at all times
-
EWP manoeuvred to working position smoothly
-
Safety observer used at all times that EWP is within live clearances
-
Observers Name
-
Operator and safety observer maintain effective communication at all times
-
Appropriate clearances maintained with EWP at all times
-
Hydraulic accessories utilised in accordance with manufactures instruction
-
Stabilisers stowed in accordance with manufactures instructions
-
EWP stowed and secured in accordance with manufactures instructions
-
Worksite left in accordance with Endeavour Energy's procedures
-
Additional notes
Sign off page
-
Operators name and signature
-
Assessors name and signature
-
SME's name and signature
-
Additional comments
-
Conclusions
-
Recommendations
-
Actions