Title Page
-
Site conducted
-
Conducted on
-
Completed by
-
Client
-
Address
EICR
-
Date of EICR
-
Date of next EICR
-
Remedial Works Complete:
-
Before Photos
-
After Photos
-
Circuit Chart Fitted
-
Site left tidy
-
Comments
Smoke and Heat Detector Inspection Report
Pre Inspection - Smoke and heat detection
-
Does the property contain Smoke detection
-
List location of detection
-
Does the property contain Heat detection
-
List location of detection
-
Does the property contain multi sensors
-
List location of detection
-
Does property have Aico Gateway Ei1000g Installed
-
Current grade & category of system in the property
- Grade D1 LD1
- Grade D1 LD2
- Grade D1 LD3
- Grade D2 LD1
- Grade D2 LD2
- Grade D2 LD3
- Grade F1 LD1
- Grade F1 LD2
- Grade F1 LD3
- Grade F2 LD1
- Grade F2 LD2
- Grade F2 LD3
-
How is system detection interlinked
-
List how detection has been interlinked
-
Confirm the expiry date for the detectors
Post Inspection - Smoke and heat detection
-
Number of Heat Detectors Installed
- 1
- 2
- 3
- 4
- 5
- 0
-
What model(s) have been installed
-
List location of devices
-
Number of Smoke Detector Installed
- 1
- 2
- 3
- 4
- 5
- 0
-
What model(s) have been installed
-
List location of devices
-
Number of Multi Sensors Installed
- 1
- 2
- 3
- 4
- 5
- 0
-
What model(s) have been installed
-
List location of devices
-
Updated grade & category of system in the property
- Grade D1 LD1
- Grade D1 LD2
- Grade D1 LD3
- Grade D2 LD1
- Grade D2 LD2
- Grade D2 LD3
- Grade F1 LD1
- Grade F1 LD2
- Grade F1 LD3
- Grade F2 LD1
- Grade F2 LD2
- Grade F2 LD3
-
Photographs of all detection in property
-
Additional Comments/Remarks:
-
Engineers Name
-
Engineers Signature