Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
BAL CERTIFICATE ASSESSMENT
DEVELOPMENT PROPOSAL
-
Date and Time of Inspection
-
Development is on Bush Fire Prone Land
-
Type of Developement
-
Location of Development
-
PBP Assessment Type
DIRECTION FROM DEVELOPMENT - NORTH EAST QUADRANT
-
Vegetation formation (within 140 metres) (Table. A2.1, pp54-55)
- N/A (no hazard)
- Dry Sclerophyll Forest
- Wet Sclerophyll Forest
- Grassy Woodland
- Heathland (tall)
- Heathland (short)
- Freshwater Wetland
- Forested Wetland
- Saline Wetland
- Rainforest
- Pine Plantation
- Grassland ? 10m APZ
-
Is vegetation remnant? (p52)
-
EffectiveSlope under the hazard (over 100m) (Fig A2.3, p56)
DISTANCE TO VEGETATION FORMATION
-
Actual (metres)
-
APZ within Lot or non/reduced-vegetated area (p52)
Construction Standards Determination (Appendix 3)
-
AS3959 Level of Construction (Table 2.4.2, p29)
- Nil
- BAL 12.5
- BAL 19
- BAL 29
- BAL 40
- BAL FZ
-
Allowable reduction (A3.4 Step 6, p62)
DIRECTION FROM DEVELOPMENT - NORTH WEST QUADRANT
-
Vegetation formation (within 140 metres) (Table. A2.1, pp54-55)
- N/A (no hazard)
- Dry Sclerophyll Forest
- Wet Sclerophyll Forest
- Grassy Woodland
- Heathland (tall)
- Heathland (short)
- Freshwater Wetland
- Forested Wetland
- Saline Wetland
- Rainforest
- Pine Plantation
- Grassland ? 10m APZ
-
Is vegetation remnant? (p52)
-
Effective Slope under the hazard (over 100m) (Fig A2.3, p56)
DISTANCE TO VEGETATION FORMATION
-
Actual (metres)
-
APZ within Lot or non/reduced-vegetated area (p52)
Construction Standards Determination (Appendix 3)
-
AS3959 Level of Construction (Table 2.4.2, p29)
- Nil
- BAL 12.5
- BAL 19
- BAL 29
- BAL 40
- BAL FZ
-
Allowable reduction (A3.4 Step 6, p62)
DIRECTION FROM DEVELOPMENT - SOUTH WEST QUADRANT
-
Vegetation formation (within 140 metres) (Table. A2.1, pp54-55)
- N/A (no hazard)
- Dry Sclerophyll Forest
- Wet Sclerophyll Forest
- Grassy Woodland
- Heathland (tall)
- Heathland (short)
- Freshwater Wetland
- Forested Wetland
- Saline Wetland
- Rainforest
- Pine Plantation
- Grassland ? 10m APZ
-
Is vegetation remnant? (p52)
-
Effective Slope under the hazard (over 100m) (Fig A2.3, p56)
DISTANCE TO VEGETATION FORMATION
-
Actual (metres)
-
APZ within Lot or non/reduced-vegetated area (p52)
Construction Standards Determination (Appendix 3)
-
AS3959 Level of Construction (Table 2.4.2, p29)
- Nil
- BAL 12.5
- BAL 19
- BAL 29
- BAL 40
- BAL FZ
-
Allowable reduction (A3.4 Step 6, p62)
DIRECTION FROM DEVELOPMENT - SOUTH EAST QUADRANT
-
Vegetation formation (within 140 metres) (Table. A2.1, pp54-55)
- N/A (no hazard)
- Dry Sclerophyll Forest
- Wet Sclerophyll Forest
- Grassy Woodland
- Heathland (tall)
- Heathland (short)
- Freshwater Wetland
- Forested Wetland
- Saline Wetland
- Rainforest
- Pine Plantation
- Grassland ? 10m APZ
-
Is vegetation remnant? (p52)
-
EffectiveSlope under the hazard (over 100m) (Fig A2.3, p56)
DISTANCE TO VEGETATION FORMATION
-
Actual (metres)
-
APZ within Lot or non/reduced-vegetated area (p52)
CONSTRUCTION STANDARTS DETERMINATION (APPENDIX 3)
-
AS3959 Level of Construction (Table 2.4.2, p29)
- Nil
- BAL 12.5
- BAL 19
- BAL 29
- BAL 40
- BAL FZ
-
Allowable reduction (A3.4 Step 6, p62)
-
Determination
-
Comments/Other Issues
-
Provide comments on matters nominated above, any other relevant matters, departures and non-compliances and note required conditions of consent.
EXERCISE OF DELEGATION
-
Is the determination of this application within your delegations specified within the Development and Environmental Services Group Guidelines for the use of Delegated Authority document
-
-
Officers Name and Accreditation Number
- Bob Goldspring BPB1615
- Robert Christlo BPB1161
- Chris Vince BPB1226
- Matthew Shannon BPB1246
- Patrick McLoughlin BPB1508
- Edo Smits BPB1491
- David Anstiss BPB1162
- John Price BPB1290
- Garon Irwin BPB1285
- Malcolm Dillon BPB1286
- Gavin McKenzie BPB1283
- Warwick Papworth BPB1160
- David Anderson BPB1314
- Michael Musson BPB1523
- Richard Murphie BPB1159
- Gareth Jenkins BPB1284
-
Signature