Information
-
Jobsite / Client Name:
-
Conducted on
-
Prepared by
-
Location
-
Foreman Name:
-
Select date
Administration
-
Weekly safety toolbox talk being performed by crew
-
Hazard communication Program including required SDS available?
-
First Aid Kit Available
Housekeeping
-
Clear access to building site, work areas clean.
-
Slip/trip hazards removed
-
Adequate supply of portable water / including disposable drinking cups and waste container
-
Proper material storage
Fall Protection
-
Are Fall Hazards Greater than 6 Feet Controlled?
-
Procedures in place to eliminate fall hazards
-
Describe the procedures in place to eliminate fall hazards
-
Personal Fall Arrest System (harness/lanyard/anchors) installed, worn, and used properly?
-
Guardrail systems properly installed and maintained (39" above walking surface minimum with 200lbs force applied, proper strength with mid rail and toe board where necessary)
-
Holes 2" and greater in smallest dimension properly protected to prevent employee fall into or through as well as provide falling object protection. (Covers secured from accidental displacement and marked hole or cover)
Fire protection
-
Proper number of abc Fire extinguishers, charged, inspected visible (within 100' of each worker and 50' of any flammable liquids or hot works)
-
Proper fuel containers used
-
Hot works procedures adhered with? (Combustibles moved away from hot works or covered with fire blanket, all sparks controlled, fire watch procedures in place)
-
Compressed gas cylinders secured upright, and used properly
-
No smoking near flammables
-
Welding shields used to protect surrounding persons
Extension / A frame Ladders
-
Inspected for defects
-
Secured properly with two man procedure
-
Proper angle 4:1 pitch and 3' above landing
-
No carrying materials up ladder. Procedures in place (backpack, rope and tie off, mechanical equipment) to get material to roof safely.
-
Not using the top two steps of A frame ladder
-
Properly utilized in locked position
-
Used for its intended purpose and inspected for structural defects
Electrical
-
GFCI tested and documented
-
Electrical systems have proper covers and no exposed wiring
-
Electrical cords in good condition
-
All ladders, scaffolding, and equipment kept a minimum of 10' from overhead power lines
-
Equipment properly locked out and de-energized
Tools & Equipment
-
Tools and equipment inspected and in good condition?
-
Guards in place and properly used
-
Utility knives sharp and employees cutting away from the body
-
Powder tools used properly by trained employees
Personal Protective Equipment
-
Proper clothing and work boots worn
-
Hard hats and safety glasses worn when required
-
Proper traffic vests worn when exposed to vehicular traffic
-
Gloves worn when required and necessary
-
Face shields worn when using abrasive wheel tools
Other
-
Provide description of any additional hazards, observations or positive performance:
-
Add media
-
Inspector Signature:
-
Foreman Signature: