Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Coffee machine is cleaned with cleaning powder and 2 groups are soaked in hot water with powder
-
Minimum coffee beans in a grinder. Transfer coffee back to the bag if necessary.
-
Glass washing machine is clean from the inside. No mould. And switched off. All two bottles of washing liquid are not empty.
-
Garbage and recycling bins are cleaned inside and outside. New bags is in the bins and organized as per standard.
-
Beer zone is cleaned.
-
Cocktail zone is cleaned perfectly from all the sides to avoid insects.
-
Speed pourers are soaked in hot water. Original lids on a bottles. Liquor bottles are in the fridge.
-
All syrup bottles are cleaned with hot water and stored in a fridge.
-
All fridges are organized and cleaned from the inside and outside.
-
All liquor shelfs and bottles there are without dust.
-
POS zone is cleaned and organized.
-
All bar mats are washed in dishwasher and setup at the bar.
-
Updates about any 86 items. Managers are informed.
-
Bar floor is mopped including hard reaching areas under the bar stations.
-
The waste of the shift is recorded.
-
All the drainage is closed or covered.
-
All surfaces are polished.
-
Is there is any issues with equipment?
-
Is there is any maintenance required?
-
Photo of the coffee machine zone.
-
Photo of the POS area.
-
Photo of the cocktail zone.
-
Photo of the glass washing area.
-
Photo of all the fridges from the inside.